Operating manual
Installation
TW160 drive
TK Aufzugswerke
57
Version 08/2021
Installation of the compensating support for SA4/SA9
Fig. 6.2-1
Screw the supplied compensating supports onto the housing of the machine
from below with 6 x M16x90 bolts and nuts as well as 2 x M16x40 washers
(tightening torque 190 Nm).
6.3
Installation (frame with rope pulley)
Fig. 6.3-1
8
6
0
(
b
e
i/
a
t
D
p
=
5
4
0
)
(
b
e
i/
a
t
D
p
=
4
5
0
/6
4
0
)
9
6
0
5
4
0
(
b
e
i/
a
t
D
p
=
5
4
0
)
(
b
e
i/
a
t
D
p
=
6
4
0
)
5
8
7
(
b
e
i/
a
t
D
p
=
4
5
0
)
6
6
0
8-9-10-11-12
Ma = 190 Nm
D p
1
2
3
1 6 4 0
(
)
1
1
0
5
(
)
3
4
5
3 5 5
(
b e i / a t D p = 5 4 0 )
(
b e i / a t D p = 4 5 0 )
3 1 0
(
b e i / a t D p = 6 4 0 )
4 0 5
1 0
1 0
4-5-6-7
Ma = 370 Nm
A
1 A
Lage der Seilrolle - rechts
position of rope pulley - right hand
Lage der Seilrolle - links
position of rope pulley - left hand
Summary of Contents for TW160
Page 1: ...OPERATING MANUAL TW160 Drive 08 2021 6234002860...
Page 6: ......
Page 24: ...Operating manual Technology TW160 drive TK Aufzugswerke 24 Version 08 2021...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ...Tachogenerator RE 0444 zu SA 1 Anschlusshinweis...
Page 107: ......
Page 111: ...OPERATING MANUAL EMERGENCY BRAKE SYSTEMS NBS TW45 TW63 TW130 TW160...