ENGLISH
7
3.0 LINKAGES AND CONNECTIONS
§
Before proceeding
with c
onnections,
please
read carefully
sections regarding
SAFETY.
§
§
All linkage & connection operations must be carried out with
the
control board disconnected from power supply; if disconnection device
cannot be seen, apply a poster: “WARNING: MAINTENANCE IN PROGRESS”.
In
ternal
operator wiring operated by factory must not be alienated.
3.1 Operator electric connection
To enter inside wiring, remove cover (1) unscrewing screws (2), see fig. A
Tab. 5: electric wires description
Pos. Connection
Wire type
1 Motor supply Wire 2x1,5 mm2
Fix 2 power wires (5) 2x1,5 mm2 to plug (4). Remember red colored wire is
+
and blue colored wire is
-
.
Clamp wire block (6) slightly loosing the wire from plug.
3.2
Operator control unit
GE UNI 24R is the electronic unit to use for 1 & 2 leaf gate.
Fig. A
OP20017
OP20018
6
4
5
5
Blue
Red
2
1
2MANUALE (INGLESE) Life.indd 7
30-10-2008 15:17:19