Operation and Maintenance Manual of Aerial Work Platform
10)
When the platform is caught, stuck or blocked by a nearby item and is unable to normally move, do
not try to release the platform via the platform controller. All staff must leave the platform before
releasing the platform via a ground controller.
11)
Be especially careful and lower the speed when the machine in the folding status is driving on an
uneven rode, a gravel road, an unstable or smooth surface, near a hole and on a slope.
12)
Do not travel the machine in any uneven or unstable road or in any other dangerous conditions,
when the platform is lifted.
13)
Do not push any item on the platform.
14)
Do not use the machine as a crane.
15)
Do not place, anchorage or suspend any load on the any part of the machine.
16)
Do not push the machine or other items via the platform.
17)
Do not operate the machine in case the chassis tray is stretched.
18)
Do not lean the platform against any nearby structure.
19)
Do not change or limit the use of the limit switch.
20)
Do not bind the platform on a nearby member.
21)
Do not place the load outside the platform guard rail.
22)
Without the written consent of the manufacturer, do not modify or change the aerial work platform.
Installing an additional device, used for carrying tools or other materials, on the platform, pedal or
guard rail, will increase platform weight, platform surface area or load.
23)
Do not change or damage any safety or stability related parts of the machine.
24)
Do not replace the key stability-related parts with those with different weights or specifications.
25)
Do not use the battery with the weight lower than that of the original one. The battery not only is
used as the weight balance in the chassis, but also plays a key role to stabilize the machine. Each
battery must reach 37kg .The minimum weight of each battery tray (including the battery) must
reach110kg.
26)
Do not place the stair or scaffold in the platform or lean the same against any part of the machine.
27)
The tools and materials, evenly distributed and able to be safely moved by the person on the
platform, can be transferred by the platform only.
28)
Do not use the machine on a movable surface or vehicle.
29)
Be sure to keep all tyres in good conditions and appropriately tighten the nuts.
1.10 Crush hazard
1)
Do not stretch the arms and the hands to any position where there is a hazard of scissor wound or
crush.
2)
When folding the guard rail, keep the hands away from the position where there is a possibility of
crush.
3)
Be sure to hold the guard rail firmly when pulling out the guard rail locking pin, to prevent the
platform guard rail from falling.
4)
When the machine is running via a controller on the ground, please make the correct and planned
judgment. Keep the safe distance between the operator, machine and the fixing item.
1.11
Hazard during operation on a slope
Do not drive the machine on a slope and side slope with overproof gradient. The rated value of slope is
applicable to the lifting machine.
Model
Item
S0507SDTCE10
4
Summary of Contents for S0507SDTCE10
Page 5: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 1 Safety 1...
Page 11: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 2 Legend 7...
Page 12: ...Operation and Maintenance Manual of Aerial Work Platform 8...
Page 14: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 3 Label 10...
Page 15: ...Operation and Maintenance Manual of Aerial Work Platform 11...
Page 16: ...Operation and Maintenance Manual of Aerial Work Platform 12...
Page 18: ...Operation and Maintenance Manual of Aerial Work Platform 14...
Page 19: ...Operation and Maintenance Manual of Aerial Work Platform 15...
Page 21: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 4 Specification 17...
Page 24: ...Operation and Maintenance Manual of Aerial Work Platform 20...
Page 25: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 5 Controller 21...
Page 37: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 6 Emergency operation 33...
Page 40: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 7 Pre operation inspection 36...
Page 43: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 8 Workstation inspection 39...
Page 45: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 9 Function test 41...
Page 49: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 10 Operation notice 45...
Page 56: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 12 Maintenance 52...
Page 76: ...Operation and Maintenance Manual of Aerial Work Platform Chapter 13 Schematic diagram 72...
Page 77: ...Operation and Maintenance Manual of Aerial Work Platform Electric schematic diagram 73...
Page 78: ...Operation and Maintenance Manual of Aerial Work Platform Hydraulic schematic diagram 74...