– 47 –
CLOSE
OPEN
Gas side
Liquid side
Indoor unit
Outdoor unit
Open
Open
3-Way
valve
3-Way
valve
2) Balance refrigerant of the 3-way(liquid side), 3-way(gas side) valves
(Gas leakage)
• Procedure
¤
Confirm that both the liquid side and gas side valves are set to the back seat.
¤Ł
Connect the charge set to the 3-way(gas side) valve's port.
• Leave the valve on the charge set closed.
• Connect the charge hose with the push pin to the service port.
¤Ø
Open the valve (Lo side) on the charge set and discharge the refrigerant until the gauge indicates 0 kg/cm
2
g.
- If there is no air in the refrigerant cycle (the pressure when the air conditioner is not running is higher than 1
kg/cm
2
g), discharge the refrigerant until the gauge indicates 0.5 to 1 kg/cm
2
g. In case of this, it will not be nec-
essary to apply an evacuation.
- Discharge the refrigerant gradually; if it is discharged too suddenly, the refrigeration oil will also be discharged.
Summary of Contents for LP-E5020CL
Page 12: ... 12 3 LP E5020CL LP E5022CL CA WIRING DIAGRAM ...
Page 13: ... 13 4 LP E5022HL HA ...
Page 66: ... 66 10 ELECTRONIC CONTROL DEVICE 10 1 MAIN P C B ASM ...
Page 68: ... 68 11 1 Circuit and Troubleshooting 11 SCHEMATIC DIAGRAM ...
Page 71: ... 71 6 51 49 47 44 50 14 11 11 1 12 10 10 1 8 9 9 1 9 2 46 42 40 48 5 6 7 49 45 55 43 1 ...