8.2 Pumping down
• Procedure
¤
Confirm that both 3-way(liquid side) and 3-way(gas
side) valves are set to the open position.
• Remove the valve stem caps and confirm that the
valve stems are in the raised position.
• Be sure to use a hexagonal wrench to operate the
valve stems.
¤Ł
Operate the unit for 10 to 15 minutes.
¤Ø
Stop operation and wait for 3 minutes, then connect
the charge set to the service port of the 3-way (gas
side) valve.
- Connect the charge hose with the push pin to the
service port.
¤Œ
Air purging of the charge hose.
• Open the low-pressure valve on the charge
equipment slightly to purge air from the charge
hose.
¤º
Set the 3-way(liquid side) valve to the closed
position.
¤
Operate the air conditioner at the cooling cycle and
stop it when the gauge indicates 1 kg/cm
2
g
¤
Immediately set the 3-way(gas side) valve to the
closed position.
- Do this quickly so that the gauge ends up indicating
3 to 5kg/cm
2
g.
¤
Disconnect the charge set, and mount the
3-way(liquid side) and 3-way(gas side) valve's stem
nuts and the service port nut.
- Use torque wrench to tighten the service port nut.
- Be sure to check gas leakage.
– 45 –
Lo
CLOSE
CLOSE
Purge the air
Gas side
Liquid side
Indoor unit
Outdoor unit
Closed
Open
3-Way
valve
3-Way
valve
Summary of Contents for LP-E5020CL
Page 12: ... 12 3 LP E5020CL LP E5022CL CA WIRING DIAGRAM ...
Page 13: ... 13 4 LP E5022HL HA ...
Page 66: ... 66 10 ELECTRONIC CONTROL DEVICE 10 1 MAIN P C B ASM ...
Page 68: ... 68 11 1 Circuit and Troubleshooting 11 SCHEMATIC DIAGRAM ...
Page 71: ... 71 6 51 49 47 44 50 14 11 11 1 12 10 10 1 8 9 9 1 9 2 46 42 40 48 5 6 7 49 45 55 43 1 ...