Service Manual 25
Installation
2) Preparation of installation parts and tools
No.
Installation Parts, Tools
Use
1
Pipe cutter (MAX 35mm Copper pipe)
Cutting the pipings
2
Remear
Remove burrs from cut edges of pipes.
3
Wrench (H5, H4 hexagonal wrench)
To open the service valve
4
Pipe bender
Bending the pipings
5
Leak detector
Check a gas-leakage of connecting part
of the pipings
6
Manifold gauge
To measure the pressure, to charge the refrigerant
7
Charge-nipple
To connect the bombe
8
Vacuum pump
To remove the air in the pipe.
9
Charge cylinder balance
To measure the refrigerant amount
10
Bombe (Freon-22)
Gas charge
Air purge
Cleaning the pipe
11
Spanner
To tighten the connecting parts of the pipings
12
Monkey spanner
13
Driver( , )
14
Benchi (150mm)
Cutting the wires
15
Tapeline
To measure the length
16
Core drill
To make holes through the concrete wall and blocks
17
Voltmeter, Amperemeter, Clampmeter
To measure the current and voltage
18
Insulation resistance tester
To measure the insulation resistance
19
Glass thermometer
To measure the intake and outlet air temperature of the indoor unit
20
Copper tubes
To use the connecting pipings
21
Insulation material
To cover the connecting pipings
22
Tape
To finish the connecting pipings
23
Electrical Leakage Breaker
To shut off the main power
24
Cable
To connect the cable from outdoor unit to indoor unit
27
Drain hose sockets, elbows
To remote the condensing water
Summary of Contents for LP-C808FA0
Page 13: ...Service Manual 13 Wiring Diagram Model LP C808FA0 ...
Page 14: ...14 Floor Standing Type Air Conditioner Model LP H808FA0 Wiring Diagram ...
Page 15: ...Service Manual 15 Model LP Z808FA0 Wiring Diagram ...
Page 60: ...60 Floor Standing Type Air Conditioner Electronic Control Device DE ICER P C B ASSY ...
Page 61: ...Service Manual 61 Circuit and Troubleshooting Schematic Diagram Schematic Diagram ...
Page 63: ...Service Manual 63 Exploded View and Replacement Parts List 135515 330870 354212 346810 ...
Page 69: ...P No 3828A30074P April 2005 Printed in Korea ...