Service Manual 33
Installation
Final Check and Test Run
After installing the unit, perform the final check and run-
ning test as follows:
Final check points
Is the unit securely mounted?
Is the installation location adequate?
Is the water piping work adequately and without
leakage?
Are trapped drain lines installed at condensate
drain connections?
Has the refrigeration cooling cycle been kept
sealed?
Is the electrical wiring adequate and are the
screws tightened on terminals?
After the above final checkings, prepare the running
test as follows:
Connect compound gauges to the check joints at
discharge and suction sides of the compressor.
Turn all switches "OFF".
Turn the main switch "ON".
Running test should be accomplished as follows:
Set operation switch at "FAN" and the fan will
start. Check to ensure that the fan sounds nor-
mal.
Next, set it at "COOL" and the compressor will
start. Check to ensure that the compressor
sounds normal.
Check discharge and suction pressure on the
compound gauges.
Check working voltage, phase balance and run-
ning current.
Check to ensure that the thermistor functions
properly.
Check to ensure that the high pressure control
switch functions correctly.
Summary of Contents for LP-C808FA0
Page 13: ...Service Manual 13 Wiring Diagram Model LP C808FA0 ...
Page 14: ...14 Floor Standing Type Air Conditioner Model LP H808FA0 Wiring Diagram ...
Page 15: ...Service Manual 15 Model LP Z808FA0 Wiring Diagram ...
Page 60: ...60 Floor Standing Type Air Conditioner Electronic Control Device DE ICER P C B ASSY ...
Page 61: ...Service Manual 61 Circuit and Troubleshooting Schematic Diagram Schematic Diagram ...
Page 63: ...Service Manual 63 Exploded View and Replacement Parts List 135515 330870 354212 346810 ...
Page 69: ...P No 3828A30074P April 2005 Printed in Korea ...