30 Floor Standing Type Air Conditioner
Installation
Set the both 3-way(liquid side) and 3-way(gas side) valves to open position with the Hexagonal
wrench for the unit operation.
Checking a gas leakage for the left piping
• Connect the manifold gauge to the service port of 3-way(gas side) valve.
Measure the pressure.
• Keep it for 5 - 10 minutes.
Ensure if the pressure indicated on the gauge is as same as that of measured at first time.
CLOSE
CLOSE
Closed
Closed
Indoor unit
Outdoor unit
Liquid side
Gas side
Summary of Contents for LP-C808FA0
Page 13: ...Service Manual 13 Wiring Diagram Model LP C808FA0 ...
Page 14: ...14 Floor Standing Type Air Conditioner Model LP H808FA0 Wiring Diagram ...
Page 15: ...Service Manual 15 Model LP Z808FA0 Wiring Diagram ...
Page 60: ...60 Floor Standing Type Air Conditioner Electronic Control Device DE ICER P C B ASSY ...
Page 61: ...Service Manual 61 Circuit and Troubleshooting Schematic Diagram Schematic Diagram ...
Page 63: ...Service Manual 63 Exploded View and Replacement Parts List 135515 330870 354212 346810 ...
Page 69: ...P No 3828A30074P April 2005 Printed in Korea ...