Accessories Installation
52
Hydro Kit
This product provides SG Ready function for users. It enables to stop internal operation (Heating /
DHW) and control target temperature depending on input signal from power provider.
How to install smart grid
Follow below procedures step 1 ~ step 3.
Step 1.
Check if the power of the unit is turned off.
Step 2.
Disassemble front panels and distinguish terminal block in Indoor PCB.
Step 3.
Connect signal cable to terminal block in PCB (TB_SG2, TB_SG1) fully as shown below.
Smart Grid
TB_SG2
TB_SG2
TB_SG1
TB_SG1
Indoor PCB
Indoor PCB
Summary of Contents for Hydro Kit
Page 77: ......