Installation
Hydro Kit
Installation Manual
27
ENGLISH
Connecting Heat Recovery systems
PRHR083 / PRHR063 / PRHR043 / PRHR033 / PRHR023
Precaution on pipe searching process
1. Please choose the ‘Mode’ according to the water temperature
- Use ‘Mode 1’ if water temperature is higher than 30 ℃(86 ℉)
- Use ‘Mode 2’ if water temperature is lower than 30 ℃(86 ℉)
2. Be sure that water pump is operating during the pipe searching process
- If the water circulation is not detected by water flow switch, ‘CH14’ error will occur.
SW01D (Rotary SW) : Selection of the Valve Group Control
Note
:
For more detailed information, refer to the installation manual of Heat Recovery Unit.
Valve Group
SW01D
Setting
Valve Group
SW01D
Setting
Not control
0
No. 5,6/7,8 Valve Control
8
No. 1,2 Valve Control
1
No. 1,2/5,6 Valve Control
9
No. 2,3 Valve Control
2
No. 1,2/7,8 Valve Control
A
No. 3,4 Valve Control
3
No. 3,4/5,6 Valve Control
B
No. 5,6 Valve Control
4
No. 3,4/7,8 Valve Control
C
No. 6,7 Valve Control
5
No. 1,2/3,4/5,6 Valve Control
D
No. 7,8 Valve Control
6
No. 1,2/3,4/6,7 Valve Control
E
No. 1,2/3,4 Valve Control
7
No. 1,2/3,4/7,8 Valve Control
F
- One connection of refrigerant pipe for HR unit is
insufficient for the flow of refrigerant. Join two pipes with a
branch pipe when connecting the
Hydro Kit
(Up to 61 kBtu/h capacity model: 8, 10 HP).
- The pipe number of the connected gas pipe and liquid
pipe must be same.
- Flow water in the
Hydro Kit
when pipe-searching
process is performed.
- Pipe-searching process error may occur if the pipe
temperature does not increase.
- It is recommended that
Hydro Kit
(8, 10 HP model) is
connected to No.1 valve and No.2 valve.
0
Summary of Contents for Hydro Kit
Page 77: ......