26
Outdoor Unit
Refrigerant piping installation
1. Line Distribution
2. Vertical Distribution
Ensure that the branch pipes are attached vertically.
3. The others
Header
1st
1st
1st
Main pipe
Distribution
2nd
2nd
3rd
3rd main
pipe distribution
1st
3rd
3rd main pipe distribution
2nd
Distribution Method