EXHAUST
Installation of Concentric Venting
Concentric venting allows the exhaust pipe and
combustion air pipe to pass through a single hole in the
roof or wall of the building. A concentric venting adapter
(CVA) is required for concentric venting.
The concentric venting adapter is designed for indoor
installations and should never be installed on the
exterior of the building.
The exhaust pipe must terminate with the vent terminal.
For horizontal venting, the combustion air pipe must
terminate with the combustion air guard. For vertical
venting, the combustion air pipe must terminate with the
inlet terminal. Depending on what was ordered, one of
these vent terminals will be provided in the optional
Concentric Venting
– Horizontal
Refer to the diagram below for venting on horizontal
concentric systems. Maintain at least 12 inches from the
combustion air inlet guard to the exhaust vent terminal
(Dim. B). To prevent water from running into the
combustion air pipe and to allow for easy installation
of the combustion air inlet guard, the combustion air pipe
must terminate at least 2 inches from the exterior
surface of the outside wall (Dim. A).
Exterior
Wall
venting kit along with the concentric venting adapter
(CVA).
If venting vertically through the roof, refer to the vertical
concentric venting instructions. If venting horizontally
through the wall, refer to the horizontal concentric
venting instructions.
Mounting
Bracket
COMBUSTION AIR
B
A
Exhaust
Vent
Termina
l
Mounting
Bracket
Combustion Air
Inlet Guard
Vent Connection Diameter
Vent terminals must be used (one vent terminal and inlet
guard included with each furnace). Construct the vent
system as shown in the drawings and refer to the table
for the correct vent connection diameters.
CVA-4
4-inch Concentric
Venting Adapter
Combustion Air Connection
Concentric Side
Combustion Air Connection
Non-Concentric Side
Top View
CVA-6
6-inch Concentric
Venting Adapter
Exhaust Connection
Concentric Side
Exhaust Connection
Non-Concentric Side
Vent Length
Refer to table for minimum and maximum vent lengths.
The total equivalent vent
length must include
elbows. The equivalent
length of a 4 inch elbow is
6 feet and the equivalent
length of a 6 inch elbow is
10 feet.
Determine Venting Location
Determine the location of the concentric venting adapter
(CVA) based on any clearances that must be maintained
(follow all codes applicable).
Attach Mounting Brackets
Attach field-supplied, corrosion-resistant, mounting
brackets to the CVA using corrosion-resistant sheet
metal screws.
CVA
Pitch vent pipe
downward
from furnace
¼ inch per foot
A = 12 inch minimum
B = 12 inch minimum
NOTE
Vent piping is supplied by others and not supplied by
manufacturer.
Non-Concentric Side Vent
Connection Diameter
Concentric Side Vent
Connection Diameter
Furnace Size
(MBH)
Exhaust
(inches)
Combustion Air
(inches)
Exhaust
(inches)
Combustion Air
(inches)
75-175
4
4
4
6
200-400
6
6
6
8
Horizontal Concentric Venting
Vent
Length
Minimum
(feet)
Maximum
(feet)
Horizontal
5
70
Summary of Contents for AR-DE12-05A
Page 75: ...Gas Supply In Typical Split Burner Manifold ...
Page 94: ...NOTE For HMA gas furnace for 311 and 352 chassis see separate IOM Manual ...
Page 96: ...HANDHELD KEYPAD DISPLAY OPTIONAL ...
Page 105: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ...Controls Sequence of Operation ...
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......