Start-Up Unit
WARNING
Prior to starting up the unit, power must be energized
for 24 hours without a call for cool to allow the
compressor crankcase heaters time to boil off any
liquid refrigerant present in the compressor.
Every installation requires a comprehensive start-up
to ensure proper operation of the unit. As part of that
process, the following checklist must be completed and
information recorded. Starting up the unit in accordance
with this checklist will not only ensure proper operation,
but will also provide valuable information to personnel
performing future maintenance. Should an issue arise
which requires factory assistance, this completed
document will allow unit experts to provide quicker
resolve. Qualified personnel should perform start-up to
ensure safe and proper practices are followed.
Unit Model No.
Unit Serial No.
Energy Wheel Date Code
Compressor 1 Model No.
Compressor 2 Model No.
Compressor 3 Model No.
Compressor 4 Model No.
Start-Up Date
Start-Up Personnel Name
Start-Up Company
Phone Number
DANGER
Electric shock hazard. Can cause injury or death.
Before attempting to perform any service or
maintenance, turn the electrical power to unit to OFF
at disconnect switch(es). Unit may have multiple
power supplies.
CAUTION
Use caution when removing access panels or other
unit components, especially while standing on a ladder
or other potentially unsteady base. Access panels and
unit components can be heavy and serious injury may
occur.
CAUTION
Do not operate without the filters and birdscreens
installed. They prevent the entry of foreign objects
such as leaves, birds, etc.
CAUTION
Do not run unit during construction phase. Damage to
internal components may result and void warranty.
WARNING
• Unit was factory tested. All blowers, fans,
and compressors are set-up to run correctly
when supplied power. If any one fan is running
backwards or the compressor is making loud
noises, immediately turn off the power. Switch two
leads on the incoming power to the disconnect.
This will ensure proper operation of the unit. Failure
to comply may damage the compressors and void
the warranty.
• Do not jumper any safety devices when operating
the unit. This may damage components within or
cause serious injury or death.
• Do not operate compressor when the outdoor
temperature is below 40ºF.
• Do not short-cycle the compressor. Allow
5 minutes between “on” cycles to prevent
compressor damage.
• DX system is charged with refrigerant. Start-up
must be performed by EPA
Certified Technician.
Summary of Contents for AR-DE12-05A
Page 75: ...Gas Supply In Typical Split Burner Manifold ...
Page 94: ...NOTE For HMA gas furnace for 311 and 352 chassis see separate IOM Manual ...
Page 96: ...HANDHELD KEYPAD DISPLAY OPTIONAL ...
Page 105: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ...Controls Sequence of Operation ...
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......