Installation
Insulated gloves
Safety goggles
Safety shoes
3.7
Installation clearance
300 mm
300 mm
9 mm
300 mm
300 mm
300 mm
300 mm
300 mm
9 mm
CO
NNEC
TIO
N KI
T
ON
OFF
CO
NNEC
TIO
N KI
T
ON
OFF
Make sure to leave a space of at least 9 mm between the battery pack and the
wall. A clearance of at least 9 mm must be left around the battery pack for
proper cooling.
NOTE
The shelf for the RESU battery pack is sold separately.
17