Connection Methods
Wiring the Phoenix Connector
Step 1:
Connect leads per the following wiring diagram
Step 2:
Twist strands of each lead tightly (making sure that there are no stray
strands) and push firmly into appropriate plug connector location.
Step 3:
Tighten the screws on the plug connector—making sure that no bare
conductor is showing.
Step 4:
Tie the Drain/Shield wires together and insulate using a small piece of
heat shrink tubing.
Step 5:
Install termination jumpers as required. Termination jumpers are
required at the two ends of the Luma-Net run. The termination can be
accomplished on the Luma-Net connector with a jumper wire as shown
below. Termination can also be accomplished on the control board by
jumpering the 2 pin header to the left of the Luma-Net connector.
Testing the Wiring
To assure problem-free start-up, it is important to check the system wiring, prior to
hooking up any control stations, for proper connections, shorts and opens.
The following procedure is recommended:
Step 1:
Test the following wire pairs for shorts at each station location, using an
ohmmeter or other continuity tester.
1-2 Open
2-3 Open
3-4 Open
REM+
REM -
CO
M
TERM
LOCK
+V
1
2
3
4
5
6
Up t
o
1 #12A
WG
2#12AWG
2#12AWG
Up t
o
1 #12A
WG
Drain/Shield - Insulated and tied together
(Ground at one point only-
probably an end)
Red (+V )
Black (Common)
5 6
1 2
3 4
Phoenix/Luma-Net Connector
Summary of Contents for EZ-MAX
Page 2: ......
Page 4: ...Page ii...
Page 10: ...Page viii...
Page 16: ...Page 6...
Page 20: ...Page 10...
Page 24: ...Page 14...
Page 26: ...Page 16...
Page 30: ...Page 20...
Page 42: ...Page 32...
Page 44: ...Page 34...
Page 46: ...Page 36...
Page 48: ...Page 38...
Page 54: ...Page 44...
Page 62: ...Page 52...
Page 64: ...Page 54...
Page 74: ...Page 64...
Page 92: ...Page 82...
Page 100: ...Page 90...
Page 112: ...Page 102...
Page 116: ...Page 106...
Page 126: ...Page 116...
Page 132: ...Page 122...
Page 134: ...Page 124...
Page 136: ...Page 126...
Page 164: ...Page 154...
Page 184: ...Page 174...