22
NE1032 Installation Guide
RJ45 Management Port
The RJ45 management port on the front panel supports 10/100/1000BASE-T, in-line
switch management.
To attach an RJ45 connector to the switch, push the RJ45 cable connector into the
port connector until it clicks into place.
To disconnect the RJ45 cable, squeeze the release tab and gently pull the cable
connector out of the switch connector.
RJ45 Management LEDs
The RJ45 management port LEDs are oriented as shown in the following figure.
Figure 5.
RJ45 management port LEDs
Status LEDs for the RJ45 management port are described in the following table.
Reset Button
The Reset button is recessed within a hole on the front panel. Use a straightened
paper clip or similar object to press the Reset button. The Reset button allows
technicians to reset the switch as follows:
Normal reset—press and release reset button. The switch will start a forced
reload procedure without saving the current configuration. This action is
intended for when the switch is unresponsive and needs to be restarted to
resume its normal functions.
Table 2.
RJ45 status LEDs behavior
LED
State
Functional Meaning
Link
Flashing green
Activity
Steady green
Link up
Off
No link
Speed
Steady green
100/1000 Mbps connection
Off
10 Mbps connection or no link
Speed LED
Link LED
Summary of Contents for ThinkSystem NE1032
Page 6: ...6 Lenovo NE1032 Installation Guide ...
Page 14: ...14 NE1032 Installation Guide ...
Page 18: ...18 NE1032 Installation Guide ...
Page 30: ...30 NE1032 Installation Guide ...
Page 86: ...86 NE1032 Installation Guide ...
Page 92: ...92 NE1032 Installation Guide ...
Page 112: ...112 NE1032 Installation Guide ...