Figure 25. Air baffle removal
Step 1. Lift the air baffle up and set it aside.
Attention:
For proper cooling and airflow, reinstall the air baffle before you turn on the server.
Operating the server with the air baffle removed might damage server components.
If you are instructed to return the component or optional device, follow all packaging instructions, and use
any packaging materials for shipping that are supplied to you.
Install the air baffle
Use this information to install the air baffle.
Before you install the air baffle, complete the following steps:
1. Read
“Installation Guidelines” on page 31
to ensure that you work safely.
To install the air baffle, complete the following steps:
Figure 26. Air baffle installation
Step 1. Align the air baffle hooks with the slots on the top of the fan cage; then, hook the air baffle onto the
slots.
After you install the air baffle, complete the following steps:
1. Install the top cover onto the server (see
“Install the top cover” on page 87
for instructions).
36
ThinkSystem SR150 Maintenance Manual
Summary of Contents for 7Y54
Page 1: ...ThinkSystem SR150 Maintenance Manual Machine Type 7Y54 ...
Page 8: ...vi ThinkSystem SR150 Maintenance Manual ...
Page 25: ...Chapter 2 Server components 17 ...
Page 38: ...30 ThinkSystem SR150 Maintenance Manual ...
Page 102: ...94 ThinkSystem SR150 Maintenance Manual ...
Page 128: ...120 ThinkSystem SR150 Maintenance Manual ...
Page 132: ...124 ThinkSystem SR150 Maintenance Manual ...
Page 137: ......
Page 138: ...Part Number SP47A31793 Printed in Chinese Mainland 1P P N SP47A31793 1PSP47A31793 ...