STEP 2 -- REFRIGERANT PIPING -- Brazing Procedures (Continued)

WHEN BRAZING LINE SET TO

SERVICE VALVES, POINT FLAME

AWAY FROM SERVICE VALVE.

LIQUID LINE SERVICE VALVE

LIQUID LINE

BRAZE LINE SET

Wrap both service valves with water-saturated cloths as illustrated here and as mentioned in step 4, before brazing to line set. Cloths must
remain water-saturated throughout the brazing and cool-down process.

WATER-SATURATED
CLOTH

IMPORTANT 

- Allow braze joint to cool. Apply additional

water-saturated cloths to help cool brazed joint. Do not
remove water-saturated cloths until piping has cooled.
Temperatures above 250ºF will damage valve seals.

6

SUCTION LINE

WATER-SATURATED
CLOTH

SUCTION LINE SERVICE

VALVE

Disconnect manifold gauge set from service ports after all connections have been brazed. Apply additional water-saturated cloths to both
service valves to cool piping. Once piping is cool, remove all water-saturated cloths.

WHEN BRAZING LINE SET TO

SERVICE VALVES, POINT FLAME

AWAY FROM SERVICE VALVE.

PREPARATION FOR NEXT STEP

7

WRAP SERVICE VALVES

To help protect service valve seals during brazing, wrap water-saturated cloths around service valve bodies and copper tube stubs. Use
additional water-saturated cloths underneath the valve body to protect the base paint.

4

FLOW NITROGEN

Flow regulated nitrogen (at 1 to 2 psig) through the refrigeration gauge set into the valve stem port connection on the liquid service valve and
out of the suction / vapor valve stem port. See steps 

3A, 3B 

and 

3C

 on manifold gauge set connections.

5

WARNING

FIRE, PERSONAL INJURY, OR PROPERTY DAMAGE

may result if you do not wrap a water-saturated cloth around
both liquid and suction line service valve bodies and copper
tube stub while brazing the line set! The braze, when
complete, must be quenched with water to absorb any
residual heat.

Do not open service valves until refrigerant lines and
indoor coil have been leak-tested and evacuated. Refer
to Installation and Service Procedures manual found on
DAVENET.

FIGURE 8

Summary of Contents for Elite XP20-024-230

Page 1: ...formation consult the Installa tion and Service Procedures manual available as Corp 1408 L10 on DaveNet or through the Technical Support department at 800 453 6669 WARNING Improper installation adjust...

Page 2: ...ructure observe the following While installing or servicing this unit carefully stow all removed panels so that the panels will not cause injury to personnel objects or nearby structures Also take car...

Page 3: ...NCHES PER 5 FEET 50 MM PER 1 5 M AWAY FROM BUILDING STRUCTURE MOUNTING SLAB BUILDING STRUCTURE GROUND LEVEL FIGURE 3 LEG DETAIL BASE 2 50 8MM SCH 40 FEMALE THREADED ADAPTER ELEVATED SLAB MOUNTING USIN...

Page 4: ...n lines Oxygen when ex posed to a spark or open flame can cause fire and or an explosion that could result in property damage personal injury or death IMPORTANT Some scroll compressors have an interna...

Page 5: ...Sizes for Horizontal Runs Required Vapor Riser Size 024 180 150 60 60 7 8 5 8 036 180 150 60 60 7 8 3 4 048 180 150 60 60 7 8 7 8 060 180 150 60 60 7 8 7 8 Table 3 Liquid Line Diameter Selection Table...

Page 6: ...id line orifice housing LOW HIGH EXISTING INDOOR UNIT GAUGE MANIFOLD CYLINDER CONTAINING CLEAN HCFC 22 TO BE USED FOR FLUSHING Positioned to deliver liquid refrigerant LIQUID LINE SERVICE VALVE INLET...

Page 7: ...ur the ends The pipe must remain round Do not crimp end of the line Remove service cap and core from both the suction and liquid line service ports 1 2 LIQUID LINE SERVICE VALVE SERVICE PORT CORE SERV...

Page 8: ...water saturated cloths WHEN BRAZING LINE SET TO SERVICE VALVES POINT FLAME AWAY FROM SERVICE VALVE PREPARATION FOR NEXT STEP 7 WRAP SERVICE VALVES To help protect service valve seals during brazing w...

Page 9: ...S NUT DISTRIBUTOR ASSEMBLY C Install one of the provided Teflon rings around the stubbed end of the expansion valve and lightly lubricate the connector threads and expose surface of the Teflon ring wi...

Page 10: ...e cylinder of HFC 410A refrigerant to the center port of the manifold gauge set Open the valve on the HFC 410A cylinder vapor only B Open the high pressure side of the manifold to allow HFC 410A into...

Page 11: ...um pump and closing the manifold gauge valves F When the absolute pressure requirement above has been met disconnect the manifold hose from the vacuum pump and connect it to a cylinder of HFC 410A pos...

Page 12: ...ge as a result of slugging CAUTION ELECTROSTATIC DISCHARGE ESD Precautions and Procedures Electrostatic discharge can affect electronic components Take care during unit installation and service to pro...

Page 13: ...s PUSH BUTTON 7 SEGMENT DISPLAY PUMP DOWN WHEN UNIT IS IN PUMP DOWN MODE Pd WILL BE DISPLAYED ON 7 SEGMENT TO ACTIVATE PUMP DOWN MODE THE CONTROL MUST BE IN THE IDLE STATE AND THE PUMP DOWN JUMPER PLA...

Page 14: ...oise see below Use a wire nut to bundle the four unused wires at each end of the cable Each bundle should also include an additional wire that should be connected on each end to the C terminal as show...

Page 15: ...cles Charging The XP20 unit is factory charged with enough HFC 410A refrigerant to accommodate a 15 foot length of refrigerant piping Charge should be checked and adjusted using the tables provided on...

Page 16: ...ealer show you the location of the drain line and how to check for ob structions This would also apply to an auxiliary drain if installed S Check the area around the outdoor unit monthly and re move a...

Page 17: ...st debris obstructions leaks or cracks Pour water in pans to confirm proper drain age from the pan through to the outlet of the pipe Clean or replace as necessary E Inspect and clean evaporator indoor...

Page 18: ...G MODE Vapor Pressure Liquid Pressure Supply Air Temperature Ambient Temperature Return Air Temperature HEATING MODE Vapor Pressure Liquid Pressure Supply Air Temperature Ambient Temperature Return Ai...