background image

506694-01

Issue 1720

Page 11 of 16

Installing New Indoor Metering Device

This outdoor unit is designed for use in existing HCFC-22 

systems that use either a fixed orifice (RFC) or expansion 

valve metering device (purchased separately) at the indoor 

coil.

See the 13ACD product specification sheet for approved 

fixed orifice sizes and expansion valve kit match ups. The 

expansion valve unit can be installed internal or external to 

the indoor coil.

A

Attach  the  vapor  line  sensing  bulb  in  the  proper

orientation as illustrated to the right using the clamp

and screws provided.

NOTE 

— Confirm proper thermal contact between vapor

line and expansion bulb before insulating the sensing bulb

once installed.

B

Connect the equalizer line from the expansion valve to the equalizer

vapor port on the vapor line. Finger tighten the flare nut plus 1/8 turn (7

ft-lbs) as illustrated below.

TWO PIECE

PATCH PLATE

(UNCASED

COIL ONLY)

VAPOR

LINE

LIQUID LINE

ORIFICE

HOUSING

DISTRIBUTOR

TUBES

LIQUID LINE

MALE EQUALIZER LINE

FITTING (SEE

EQUALIZER LINE

INSTALLATION FOR

FURTHER DETAILS)

SENSING

LINE

EQUALIZER

LINE

EXPANSION

VALVE

TEFLON

®

RING

(Uncased Coil Shown)

Sensing  bulb  insulation  is  required  if

mounted external to the coil casing. sensing

bulb installation for bulb positioning.

STUB

END

TEFLON

®

RING

LIQUID LINE

ASSEMBLY WITH

BRASS NUT

DISTRIBUTOR

ASSEMBLY

A

Remove  the  field-provided  fitting  that  temporarily

reconnected  the  liquid  line  to  the  indoor  unit's

distributor assembly.

B

Install one of the provided Teflon

®

 rings around the

stubbed  end  of  the  expansion  valve  and  lightly

lubricate the connector threads and expose surface of

the Teflon

®

 ring with refrigerant oil.

C

Attach the stubbed end of the expansion valve to the

liquid line orifice housing. Finger tighten and use an

appropriately sized wrench to turn an additional 1/2 turn clockwise as

illustrated in the figure above, or 20 ft-lb.

D

Place the remaining Teflon

®

 washer around the other end of the expansion

valve.  Lightly  lubricate  connector  threads  and  expose  surface  of  the

Teflon

®

 ring with refrigerant oil.

E

Attach the liquid line assembly to the expansion valve. Finger tighten and

use an appropriately sized wrench to turn an additional 1/2 turn clockwise

as illustrated in the figure above or 20 ft-lb.

ON  7/8”  AND  LARGER LINES,

MOUNT  SENSING  BULB  AT

EITHER THE 4 OR 8 O'CLOCK

POSITION. NEVER MOUNT ON

BOTTOM OF LINE.

12

ON LINES SMALLER THAN

7/8”,  MOUNT  SENSING

BULB AT EITHER THE 3 OR

9 O'CLOCK POSITION.

12

BULB

VAPOR LINE

VAPOR LINE

NOTE — NEVER

MOUNT ON BOTTOM

OF LINE.

BULB

BULB

BULB

VAPOR LINE

FLARE NUT

COPPER FLARE

SEAL BONNET

MALE BRASS EQUALIZER

LINE FITTING

FLARE SEAL CAP

OR

1

2

3

4

5

6

7

8

9

10

11 12

1/2 Turn

SENSING BULB INSTALLATION

EQUALIZER LINE INSTALLATION

1

2

3

4

5

6

7

8

9

10

11 12

1/8 Turn

Remove and discard either the flare seal cap or flare nut with copper flare

seal bonnet from the equalizer line port on the vapor line as illustrated in the

figure below.

INDOOR EXPANSION VALVE

INSTALLATION

TEFLON

®

 RING

FIXED ORIFICE

BRASS NUT

LIQUID LINE ORIFICE HOUSING

DISTRIBUTOR TUBES

REMOVE AND DISCARD WHITE

TEFLON

®

 SEAL (IF PRESENT)

FIXED ORIFICE (RFC)

DEVICE INSTALLATION

1A

1B

SEE TABLE 3 FOR

INDOOR FIXED

ORIFICE KITS CATALOG

NUMBERS.

Figure 8. Installing Indoor Metering Device

Summary of Contents for 13ACD-018-230

Page 1: ...rged with dry nitrogen The unit is intended for installation in existing HCFC 22 systems Carefully follow all installation procedures Open both service valves to evacuate system This unit is construct...

Page 2: ...ce included with outdoor unit or thermal expansion valve TXV See the 13ACD product specification sheet for approved fixed orifice sizes and expansion valve kit match ups Important The air conditioning...

Page 3: ...K SEATED OPENED BALL SHOWN CLOSED SERVICE PORT CORE TO INDOOR UNIT TO OUTDOOR UNIT TO OPEN ROTATE STEM COUNTERCLOCKWISE 90 TO CLOSE ROTATE STEM CLOCKWISE 90 SERVICE PORT SERVICE PORT CAP STEM CAP VALV...

Page 4: ...rnal pressure relief valve Compressor has internal vacuum protection that is designed to unload the scrolls compressor stops pumping when the pressure ratio meets a certain value or when the suction p...

Page 5: ...ANEL MINIMUM CLEARANCE ABOVE UNIT NOTES Clearance to one of the other three sides must be 36 inches 914mm Clearance to one of the remaining two sides may be 12 inches 305mm and the final side may be 6...

Page 6: ...ides information on replacement of existing line set If replacement line set is not required then proceed to Brazing Connections on Page 7 Refrigerant Line Set Field refrigerant piping consists of liq...

Page 7: ...ay result in ignition of the refrigerant and oil mixture Check the high and low pressures before applying heat WARNING Allow braze joint to cool before removing the wet rag from the service valve Temp...

Page 8: ...OM SERVICE VALVE Flow regulated nitrogen at 1 to 2 psig through the low side refrigeration gauge set into the liquid line service port valve and out of the suction vapor line service port valve CUT AN...

Page 9: ...RVICE VALVE PREPARATION FOR NEXT STEP 7 WARNING 1 FIRE PERSONAL INJURY OR PROPERTY DAMAGE will result if you do not wrap a wet cloth around both liquid and suction line service valve bodies and copper...

Page 10: ...H Use a field provided fitting to temporary reconnect the liquid line to the indoor unit s liquid line orifice housing LOW HIGH EXISTING INDOOR UNIT GAUGE MANIFOLD INVERTED CYLINDER CONTAINS CLEAN LI...

Page 11: ...d end of the expansion valve and lightly lubricate the connector threads and expose surface of the Teflon ring with refrigerant oil C Attach the stubbed end of the expansion valve to the liquid line o...

Page 12: ...unit A trace amountis a maximum of two ounces 57 g refrigerant or three pounds 31 kPa pressure Close the valve on the HCFC 22 cylinder and the valve on the high pressure side of the manifold gauge set...

Page 13: ...nnect the manifold gauge to the vacuum pump turn the pump on and continue to evacuate the line set and indoor unit until the absolute pressure does not rise above 500 microns 29 9 inches of mercury wi...

Page 14: ...HERMOSTAT 5 FEET 1 5M CHECK EXISTING ROOM THERMOSTAT Any excess high voltage field wiring should be trimmed and secured away from any low voltage field wiring To facilitate a conduit a cutout is locat...

Page 15: ...system using evacuating procedure provided in this instruction 3 Use nitrogen to break the vacuum and install a new filter drier in the system 4 Evacuate the system again using evacuating procedure p...

Page 16: ...per tension 5 Check all wiring for loose connections 6 Check for correct voltage at unit blower operating 7 Check amp draw on blower motor Motor Nameplate _________ Actual __________ Indoor Coil 1 Cle...