background image

506694-01

Issue 1720

Page 8 of 16

ATTACH THE MANIFOLD GAUGE SET FOR BRAZING LINE SETS TO LIQUID AND SUCTION / VAPOR

LINE SERVICE VALVES

OUTDOOR

UNIT

LIQUID LINE

VAPOR LINE

LIQUID LINE SERVICE

VALVE

SUCTION /

VAPOR LINE

SERVICE

VALVE

ATTACH

GAUGES

 

INDOOR

UNIT

SUCTION / VAPOR SERVICE PORT MUST BE

OPEN TO ALLOW EXIT POINT FOR NITROGEN

A

Connect gauge set low pressure side to

liquid line service valve (service port).

B

Connect gauge set center port to bottle of

nitrogen with regulator.

C

Remove Schrader valve in suction / vapor

line service port to allow nitrogen to escape.

NITROGEN

HIGH

LOW

USE REGULATOR TO FLOW

NITROGEN AT 1 TO 2 PSIG.

B

A

C

WHEN BRAZING LINE SET TO

SERVICE VALVES, POINT FLAME

AWAY FROM SERVICE VALVE.

Flow regulated nitrogen (at 1 to 2 psig) through the low-side refrigeration gauge set into the liquid line service port valve, and out of the suction /

vapor line service port valve.

CUT AND DEBUR

CAP AND CORE REMOVAL

Cut ends of the refrigerant lines square (free from nicks or dents)

and debur the ends. The pipe must remain round. Do not crimp end

of the line.

Remove service cap and core from both the

vapor and liquid line service ports.

1

2

LIQUID LINE SERVICE

VALVE

SERVICE

PORT

CORE

SERVICE PORT

CAP

SERVICE

PORT

CORE

SERVICE

PORT CAP

CUT AND DEBUR

LINE SET SIZE MATCHES

SERVICE VALVE CONNECTION

COPPER TUBE

STUB

SERVICE VALVE

CONNECTION

REFRIGERANT LINE

DO NOT CRIMP SERVICE VALVE

CONNECTOR WHEN PIPE IS

SMALLER THAN CONNECTION

REDUCER

3

SUCTION / VAPOR LINE

SERVICE VALVE

LINE SET SIZE IS SMALLER

THAN CONNECTION

LIQUID LINE FILTER DRIER

(FIELD-PROVIDED)

Figure 6A. Brazing Procedure

Summary of Contents for 13ACD-018-230

Page 1: ...rged with dry nitrogen The unit is intended for installation in existing HCFC 22 systems Carefully follow all installation procedures Open both service valves to evacuate system This unit is construct...

Page 2: ...ce included with outdoor unit or thermal expansion valve TXV See the 13ACD product specification sheet for approved fixed orifice sizes and expansion valve kit match ups Important The air conditioning...

Page 3: ...K SEATED OPENED BALL SHOWN CLOSED SERVICE PORT CORE TO INDOOR UNIT TO OUTDOOR UNIT TO OPEN ROTATE STEM COUNTERCLOCKWISE 90 TO CLOSE ROTATE STEM CLOCKWISE 90 SERVICE PORT SERVICE PORT CAP STEM CAP VALV...

Page 4: ...rnal pressure relief valve Compressor has internal vacuum protection that is designed to unload the scrolls compressor stops pumping when the pressure ratio meets a certain value or when the suction p...

Page 5: ...ANEL MINIMUM CLEARANCE ABOVE UNIT NOTES Clearance to one of the other three sides must be 36 inches 914mm Clearance to one of the remaining two sides may be 12 inches 305mm and the final side may be 6...

Page 6: ...ides information on replacement of existing line set If replacement line set is not required then proceed to Brazing Connections on Page 7 Refrigerant Line Set Field refrigerant piping consists of liq...

Page 7: ...ay result in ignition of the refrigerant and oil mixture Check the high and low pressures before applying heat WARNING Allow braze joint to cool before removing the wet rag from the service valve Temp...

Page 8: ...OM SERVICE VALVE Flow regulated nitrogen at 1 to 2 psig through the low side refrigeration gauge set into the liquid line service port valve and out of the suction vapor line service port valve CUT AN...

Page 9: ...RVICE VALVE PREPARATION FOR NEXT STEP 7 WARNING 1 FIRE PERSONAL INJURY OR PROPERTY DAMAGE will result if you do not wrap a wet cloth around both liquid and suction line service valve bodies and copper...

Page 10: ...H Use a field provided fitting to temporary reconnect the liquid line to the indoor unit s liquid line orifice housing LOW HIGH EXISTING INDOOR UNIT GAUGE MANIFOLD INVERTED CYLINDER CONTAINS CLEAN LI...

Page 11: ...d end of the expansion valve and lightly lubricate the connector threads and expose surface of the Teflon ring with refrigerant oil C Attach the stubbed end of the expansion valve to the liquid line o...

Page 12: ...unit A trace amountis a maximum of two ounces 57 g refrigerant or three pounds 31 kPa pressure Close the valve on the HCFC 22 cylinder and the valve on the high pressure side of the manifold gauge set...

Page 13: ...nnect the manifold gauge to the vacuum pump turn the pump on and continue to evacuate the line set and indoor unit until the absolute pressure does not rise above 500 microns 29 9 inches of mercury wi...

Page 14: ...HERMOSTAT 5 FEET 1 5M CHECK EXISTING ROOM THERMOSTAT Any excess high voltage field wiring should be trimmed and secured away from any low voltage field wiring To facilitate a conduit a cutout is locat...

Page 15: ...system using evacuating procedure provided in this instruction 3 Use nitrogen to break the vacuum and install a new filter drier in the system 4 Evacuate the system again using evacuating procedure p...

Page 16: ...per tension 5 Check all wiring for loose connections 6 Check for correct voltage at unit blower operating 7 Check amp draw on blower motor Motor Nameplate _________ Actual __________ Indoor Coil 1 Cle...

Reviews: