Installation manual - English
Walls
When installing the walls, it is important to remember that:
¾
The logs are always assembled with their tongue upwards!
¾
If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer!
Install the walls in accordance with the appended wall plans (see Technical specifications).
ATTENTION:
The
floor boards need to be installed before installing the walls!
The first layer of logs:
At first, place the half logs (pos. 001) of half of the sides (see Technical specifications) and then place
between them the logs (pos. 004). Check that the first layer of logs would suit the foundation joists.
You have to observe that the first layer of logs would reach a little over the foundation joists: ca 3-5 mm.
This way you will protect the garden pavilion against moisture, so the rainwater could easily flow into the
ground.
Now remove the logs (pos. 004) and attach half logs (pos. 001) with screws to the foundation.
ATTENTION:
Make sure that the measurements of the foundation would be the same as given in the
Technical specifications.
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary, use the
hitting block and hammer. At the same time, do not forget to begin the installation of the door and windows.
You should definitely begin the door installation after the 5
th
-6
th
layer of logs.
Summary of Contents for Palmako Hanna
Page 2: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ...Pavilion Y44 5742 13 19 ...
Page 36: ...Pavilion Y44 5742 15 19 ...
Page 37: ...Pavilion Y44 5742 16 19 ...
Page 38: ...Pavilion Y44 5742 17 19 ...
Page 39: ...Pavilion Y44 5742 18 19 ...
Page 40: ...Pavilion Y44 5742 19 19 ...
Page 41: ......