Installation manual - English
Door installation:
The doorframe is placed at the
formed aperture and pushed with
force onto the lower log. Place the
leaves on the hinges now. To open
and close the door, fit the separately
packaged lock and handle.
Window installation:
Continue with the installation of the
wall logs until you reach the window
height. The wall plans (see Technical
specifications) show how many logs
go under the window. Install the
window similarly with the door.
Just like the door, push the window frame with the window into the window aperture onto the lower log,
applying force. Make sure that the window is not fitted backwards (topsy-turvy).
ADVICE
: Definitely make sure that the windows and doors open in the proper direction. The doors open
from the inside
to the outside
. The windows of the pavilions also open
to the outside
(the window handles
are on the inside).
ATTENTION
: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it will
be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, the wall
logs will begin subsiding.
You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the pavilion
installation, when the pavilion will have become adapted to weather conditions and its logs settled.
Please notice that after assembling wall logs, all walls must be with equal height. After insuring the equal
height of the walls, part pos 151 must be screwed to walls as shown on the drawing on the next page.
Summary of Contents for Palmako Hanna
Page 2: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ...Pavilion Y44 5742 13 19 ...
Page 36: ...Pavilion Y44 5742 15 19 ...
Page 37: ...Pavilion Y44 5742 16 19 ...
Page 38: ...Pavilion Y44 5742 17 19 ...
Page 39: ...Pavilion Y44 5742 18 19 ...
Page 40: ...Pavilion Y44 5742 19 19 ...
Page 41: ......