background image

Please retain product label and instructions for future reference

             

03TGCOR0808-V3

Please retain product label and instructions for future reference

             

01636880514

Dimensions

Depth = 248cm

Width = 248cm

Height = 211cm 

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

This building should be erected by 

two people.

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(

not supplied) 

including

 

 a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are delivered pre-treated with a water based timber treatment 

however this only helps to protect during transit of your garden item. 

To 

validate your guarantee and for better protection against weathering

 it is 

ESSENTIAL

 that you treat the garden building with a wood preserver within 3 

months of assembly. This will need to be re-applied annually to ensure longevity 

of your building. Care must be taken when constructing the garden building 

that it is not touching the ground and is on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and 

annual treatment.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  The base should be slightly 

smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run off for water. It is also recommended 

that the floor be at least 25mm above the surrounding ground level to avoid flooding.

2440x1400mm 2440x1030mm

1460x2515mm 1060x2515mm

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

1720x600mm

1720x600mm

3x Front/Side Fascia- 60 x 1485mm

2x Rear Fascia- 60 x 2516mm

Fascia

2x Front Cover Trim- 45 x2055mm

2x Side Cover Trim- 30 x2055mm

Strip

Door Panel

Window Panel

Rear Panel Right

Rear Panel Left

Floor

1x Roof  bar- 45 x 2633mm

1x Roof Support block- 32 x 210mm

Framing

1x Rear Panel Framing- 30 x 1918mm

Fixing Kit

1

2

3

4

5

6

7

8

Angled Floor

P1

P2

P3

P4

P5

P6

Roof

Angled Roof

P7

P8

1x Rear Roof Framing- 32 x 2450mm

1x Front Roof Framing- 32 x 1411mm

9

Slave Door

P9

Master Door

P10

Whilst all products manufactured  are made to the highest standards of safety and in the case of childrens products independently tested to EN71 level, we  
cannot accept responsibility for your safety whilst erecting or using this product.

Reviews: