59
Programs
TPS400-5.0.1en
Orthogonal Stake out
The position offset between measured point and
stake out point is indicated in a longitudinal and
transversal element.
1) Actual
2) Point to be stake out
S
L:
Longitudinal offset: positive if nominal
point further away.
S
T:
Transversal offset, perpendicular to
line-of-sight: positive if nominal point is
to the right of measured point.
Cartesian Stake out
Setting out is based on a coordinate system and the
offset is divided into a north and east element.
1) Actual
2) Point to be stake out
S
E
Easting offset between stake out and actual
point.
S
N
Northing offset between stake out and
actual point.