
Understanding Stake and Check Basics
271
Use stake offset
Working with a stake offset of -1 m and a stake height difference of 0 m returns the following
results for the same position:
Stake Offset
and
Stake Ht Diff
are stored with the task
and will be maintained when the task is restarted.
Refer to "11.5 Stake Offset and Stake Height Differ-
ence" for information on how stake offsets are defined.
The horizontal offset
∆
Offset
from the position to stake out
is now -0.159 m (0.841 - 1). All other values stay the
same as when a stake-offset was not used.
Summary of Contents for RoadRunner
Page 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Page 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Page 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Page 121: ...Step 4 Measuring RoadRunner 121 ...
Page 158: ...158 RoadRunner Configuring Screen ...
Page 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Page 191: ...Configuring RoadRunner 191 ...
Page 201: ...Managing the Project RoadRunner 201 ...
Page 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Page 251: ...Working with the Extras Menu RoadRunner 251 ...
Page 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Page 340: ...i 340 RoadRunner Index ...
Page 341: ...Index RoadRunner i 341 ...