
Managing the Road Job
207
8.4
Creating a New Road Job
Description
There are two ways of creating road jobs:
Typing them in manually by using the Alignment Tool Kit (ATK) program.
OR
Converting data created in a design package.
Manually entered data
Data can be typed in and edited with ATK or via RoadEd. Refer to "Alignment Tool Kit" and
"RoadEd" for information on how to enter data manually.
Converted data
The Design to Field component of LGO offers converters from several road design and CAD
packages. Several design packages also include a built in converter to RoadRunner. As
different design packages follow different philosophies in representation, creation and
storage of data the conversion process differs slightly.
The LGO, LEICA Geo Office, can be found on the "System 1200 Office SW" CD.
RR12_065
Summary of Contents for RoadRunner
Page 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Page 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Page 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Page 121: ...Step 4 Measuring RoadRunner 121 ...
Page 158: ...158 RoadRunner Configuring Screen ...
Page 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Page 191: ...Configuring RoadRunner 191 ...
Page 201: ...Managing the Project RoadRunner 201 ...
Page 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Page 251: ...Working with the Extras Menu RoadRunner 251 ...
Page 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Page 340: ...i 340 RoadRunner Index ...
Page 341: ...Index RoadRunner i 341 ...