
Configuring
183
Available items
a) Relevant triangle of the DTM
b) Projected point on DTM
c) Easting
d) Northing
e)
DTM Ht Diff
f)
Flow Directn
g)
Flow Ratio
Field
Option
Description of Field
DTM Task
Output
Name defined for the DTM task.
DTM Ht Diff
Output
Vertical height difference to the DTM.
∆
Height
Output
Height difference to the layer.
DTM Height
Output
Height of the DTM at the current measured position.
Flow Directn
Output
Direction of maximum slope ratio on the current DTM
triangle. This is the direction water would flow
towards from the projected point.
Flow Ratio
Output
Slope ratio of the DTM. This is the maximum slope
ratio of the triangle.
DTM Name
Output
Name of the DTM surface.
Act Easting
Output
Easting of the current position.
a
e
g
f
c
b
RR12_046
d
Summary of Contents for RoadRunner
Page 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Page 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Page 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Page 121: ...Step 4 Measuring RoadRunner 121 ...
Page 158: ...158 RoadRunner Configuring Screen ...
Page 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Page 191: ...Configuring RoadRunner 191 ...
Page 201: ...Managing the Project RoadRunner 201 ...
Page 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Page 251: ...Working with the Extras Menu RoadRunner 251 ...
Page 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Page 340: ...i 340 RoadRunner Index ...
Page 341: ...Index RoadRunner i 341 ...