
112
Step 4 - Measuring
Workflow
• Refer to "11.7.4 Slope Staking With Batter Rails" for more information on the batter rail
method.
• The first peg to stake out is
always the peg closest to the hinge point.
Step
Description
1.
Stake out the position of the first peg of the batter by using
∆
Offset
. The height of
the rail over ground
Rail over Grd
is taken into account for
∆
Offset
. This means
that when
∆
Offset
is
equal to zero the first peg is in the correct position.
2.
Place the pole on top of the first peg. The value for
∆
Height
indicates how far
below the top of the peg the batter has to be placed.
3.
Stake out the second peg of the batter rail by using
∆
Chainage
and place the peg.
4.
Place the pole on the position of the batter rail to be used as a reference for the
slope values to mark on the batter rail.
∆
Height
should read now zero. Note that
all values shown under the
Info
page are relative to the original slope.
Summary of Contents for RoadRunner
Page 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Page 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Page 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Page 121: ...Step 4 Measuring RoadRunner 121 ...
Page 158: ...158 RoadRunner Configuring Screen ...
Page 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Page 191: ...Configuring RoadRunner 191 ...
Page 201: ...Managing the Project RoadRunner 201 ...
Page 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Page 251: ...Working with the Extras Menu RoadRunner 251 ...
Page 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Page 340: ...i 340 RoadRunner Index ...
Page 341: ...Index RoadRunner i 341 ...