OMEGA
Installation Manual
Edition Dec. 2004
Omega
platform lift
page 3 of 24
Beginning the Installation
•
There may be special installation notes enclosed with your particular lift. Read these
instructions thoroughly before proceeding.
•
Refer to the tube layout drawing and familiarise yourself with the tube configuration.
•
Ensure that the main power hook-up will be completed before the end of the installation.
•
Bring the drive box and the rail parts to their installation location.
Caution:
The large drive box is heavy; it weighs approximately 120 kg.
A dolly might be necessary.
Installing the Railway
•
Note:
See the following diagrams for some typical mounting arrangements. The
bows between the tubes of the railway can be mounted on pillars or on the wall.
Mounting onto the wall.
Mounting on pillars.
Mounting on pillars.
Pillar screwed on the wall
Pillars mounted
of the staircase.
in the well hole.