OMEGA
Installation Manual
Edition Dec. 2004
Omega
platform lift
page 2 of 24
Observe the following points before installation!
This installation manual is written for all installation teams authorised by
Lehner-Lifttechnik
.
Installation teams must have a general knowledge in
•
working on electric controls.
•
reading and understanding circuit diagrams and wiring schematics.
In order to save time and energy, it is wise to be properly prepared before installing the
OMEGA-platform lift. The following points will assist in completing the installation efficiently and
on schedule.
•
Have a complete tool kit on hand.
•
Check the packages for shipping damage and missing parts before bringing the lift to
the site.
•
Open the installation package (which is in the box of the OMEGA lift). Review the
enclosed Installation notes, if supplied. In some cases, additional components must be
brought to the site.
•
Contact the customer and arrange a time for installation. Ensure that the main power will
be supplied on time.
•
Assemble a team of two technicians to mount the plant.
•
Inform the customer once you arrive that you will be occupying the stairway, and that you
may need to rope it off.
•
Read the sections for any optional equipment that is supplied with the lift before
beginning the installation.