15
At left, you can see the leg system mounted. The
arrow points to the installed spring and ball-
bearing. Make sure this is in place and offer up
the floorboard carefully to this mount.
Just like when we removed the floorboard, we
want to slide the pins in to hold it in place. Have a
small screwdriver or something that will allow
you to push these toward the middle, through the
holes on the outside.
Carefully lower the board onto the mount, being
careful not to disturb the spring or ball-bearing.
Once in place, push each of the pins
though the board and the mount holes
on the leg system until they have about
¼” showing on both sides of the
floorboard casting. You will know you
have the correct amount if the floor-
board cover can fall back into place. If
not, make small adjustments to the
pins to center them, and make sure the
floorboard cover sits back down
nicely.
Please Note: The floorboards on our
mount only flip a small amount. This
allows cleaning if/when needed. We
would have had to make the mounts a
bit wider and higher to allow the
boards to flip up. We felt this was
unnecessary due to the fact that out leg
mounts are fixed in the same spot the
floorboards occupy when they are down.
Make sure the rubber is flat and stuck in the down position. Let’s run the air lines.
Summary of Contents for LandinGear Generation II
Page 2: ...2 ...
Page 9: ...9 Pin Out for Handlebar Control Box Plugs ...
Page 40: ...40 ILLUSTRATIONS ...