4
LeeBoy 8510E Conveyor Paver
4-23
Operation
Electric Screed Heat (Option)
The LeeBoy 8510E Conveyor Paver offers an optional
Electric Heat system to heat the screed, including the
screed extensions, in lieu of the propane burner system.
A hydraulically-driven generator powers the electric
heat control box mounted in the center on the rear side
of the machine. This control box is where you will select
the heating function before you begin to pave.
(Figure
4-38)
A hydraulically-driven generator provides power to the
electric heat control box mounted in the center on the
rear side of the machine. The electric heat box is pre-
wired for the heated endgates option. If not equipped
with this option, the left and right endgate switches do
not function.
2
3
1
5
4
Figure 4-38.
Electric Heat Control Box
1 - Left and Right Endgate Switches
(OPTION)
2 - Heat On Light
3 - Circuit Breaker
4 - Start Heat Button
5 - Power Switch
Once the heating function has been enabled, the
distribution/control box will apply electrical power to the
heating elements and the heating cycle will begin. The
heating cycle is timed to optimize the heat generated at
the screed plates.
When using the screed extension(s), light the screed
extension(s) after the main screed burner has been lit
following these additional steps
(Figure 4-37)
:
5. Lift up on the burner coupler to release ignitor.
6. Lift ignitor wand, turn valve counterclockwise to
the OPEN position and light the ignitor end with the
torch striker.
7. Replace the lit ignitor wand into the burner cradle.
8. Push down on burner coupler back into place.
1
3
2
Figure 4-37.
Extension Burner
1 - Extension Ignitor Wand Valve
2 - Burner Coupler
3 - Burner
NOTE: Adjust the pressure regulator valve IN or OUT
until the propane pressure regulator gauge
reads 15 pounds.
NOT
E: It may be necessary to maintain low heat on
the screed if paving on a cool, windy day.
Reduce pressure on the propane pressure
regulator gauge to two pounds (.14 bar) in
these conditions. DO NOT attempt to regulate
the burner with the burner valve.
After the main screed (and screed extension) has
heated for 15 minutes:
1. Turn the propane tank valve clockwise to the
CLOSE position to allow the propane system to
burn off all the gas.
(Figure 4-35)
2. When the flames extinguish, TURN OFF ALL burner
valves clockwise to the OFF position.
(Figures
4-34 through 4-36)
Summary of Contents for 8510E
Page 2: ......
Page 14: ...NOTES xiv LeeBoy Model 8510E Conveyor Paver...
Page 16: ...NOTES Safety LeeBoy 8510E Conveyor Paver 1 2...
Page 26: ...NOTES Safety LeeBoy 8510E Conveyor Paver 1 12...
Page 40: ...NOTES Leeboy Model 8510E Conveyor Paver 3 2 Component Location...
Page 52: ...3 14 Leeboy Model 8510E Conveyor Paver Component Location NOTES...
Page 144: ...Maintenance LeeBoy 8510D Conveyor Paver 5 54 NOTES...
Page 148: ...LeeBoy 8510E Conveyor Paver 6 4 Schematics NOTES...
Page 150: ...LeeBoy 8510E Conveyor Paver 6 6 Schematics NOTES...
Page 152: ...LeeBoy 8510E Conveyor Paver 6 8 Schematics NOTES...
Page 154: ...LeeBoy 8510E Conveyor Paver 6 10 Schematics NOTES...
Page 156: ...LeeBoy 8510E Conveyor Paver 6 12 Schematics NOTES...
Page 158: ...LeeBoy 8510E Conveyor Paver 6 14 Schematics NOTES...
Page 160: ...LeeBoy 8510E Conveyor Paver 6 16 Schematics NOTES...
Page 162: ...LeeBoy 8510E Conveyor Paver 6 18 Schematics NOTES...
Page 164: ...LeeBoy 8510E Conveyor Paver 6 20 Schematics NOTES...
Page 166: ...LeeBoy 8510E Conveyor Paver 6 22 Schematics NOTES...
Page 168: ...LeeBoy 8510E Conveyor Paver 6 24 Schematics NOTES...
Page 170: ...LeeBoy 8510E Conveyor Paver 6 26 Schematics NOTES...
Page 172: ...LeeBoy 8510E Conveyor Paver 6 28 Schematics NOTES...
Page 174: ...LeeBoy 8510E Conveyor Paver 6 30 Schematics NOTES...
Page 176: ...LeeBoy 8510E Conveyor Paver 6 32 Schematics NOTES...
Page 178: ...LeeBoy 8510E Conveyor Paver 6 34 Schematics NOTES...
Page 180: ...LeeBoy 8510E Conveyor Paver 6 36 Schematics NOTES...
Page 182: ...LeeBoy 8510E Conveyor Paver 6 38 Schematics NOTES...
Page 184: ...LeeBoy 8510E Conveyor Paver 6 40 Schematics NOTES...
Page 186: ...LeeBoy 8510E Conveyor Paver 6 42 Schematics NOTES...
Page 188: ...LeeBoy 8510E Conveyor Paver 6 44 Schematics NOTES...
Page 190: ...LeeBoy 8510E Conveyor Paver 6 46 Schematics NOTES...
Page 192: ...LeeBoy 8510E Conveyor Paver 6 48 Schematics NOTES...
Page 194: ...LeeBoy 8510E Conveyor Paver 6 50 Schematics NOTES...
Page 196: ...LeeBoy 8510E Conveyor Paver 6 52 Schematics NOTES...
Page 198: ...LeeBoy 8510E Conveyor Paver 6 54 Schematics NOTES...
Page 200: ...LeeBoy 8510E Conveyor Paver 6 56 Schematics NOTES...
Page 202: ...LeeBoy 8510E Conveyor Paver 6 58 Schematics NOTES...
Page 204: ...LeeBoy 8510E Conveyor Paver 6 60 Schematics NOTES...
Page 206: ...LeeBoy 8510E Conveyor Paver 6 62 Schematics NOTES...
Page 210: ...Illustrated Parts List LeeBoy 8510E Conveyor Paver 7 4...
Page 391: ...NOTES 7 Illustrated Parts List LeeBoy 8510E Conveyor Paver 7 185...
Page 443: ......