53
2. Cable connection of POD for single system
UPS has 4 kinds of configurations, so there are 4 kinds of cable connections.
NOTE: Before connecting the cables, please first confirm the configuration of the UPS,
generally the UPS is configured as the type of 3-phase input and 3-phase output (3/3) as default.
If changing to 3-phase input and one phase output (3/1), please first set the UPS as the type of
3-phase input and one phase output as per the UPS user manual.
(1) 3-phase input and 3-phase output with common input
(a) Please refer to the diagram below, connect oA, oB, oC, oN, mN, mA, mB, mC, PE on the bottom
connection terminal row of POD to the corresponding positions on the UPS.
(b) The top connection terminal row is for connecting the input and output cables of the whole
system.
(c) Battery cabeles should be dircetly connected to the corresponding positions on the UPS.
(2) 3-phase input and 3-phase output with dual input
(a) Remove these copper sheets (named B1) between mA and bA, mB and bB, mC and bC of COP
and UPS.
(b) Please refer to the diagram below, connect oA, oB, oC, oN, mN, bN, mA, bA, mB, bB, mC, bC