Dimension(W*D*H)mm
Weight
10kVA
488*945*130
25kg
15kVA
488*945*130
30kg
2.2 Unpacking and Inspection
1) Unpack the packaging and check the package contents. The shipping package contains:
● 1 UPS
● 1 user manual
2) Inspect the appearance of the UPS to see if there is any damage during transportation. Do not
turn on the unit and notify the carrier and dealer immediately if there is any damage or lacking of
some parts.
3) If you need tower type installation, you need to find the support block and the middle seat in
advance. You need a support seat and 2 middle seats
2.3 Notes for Installation
(1) The UPS must be installed in a location with good ventilation, far away from water, inflammable
gas and corrosive agents.
(2) Ensure the air vents on the front and rear of the UPS are not blocked. Allow at least 0.5m of
space on each side.
(3) Condensation to water drops may occur if the UPS is unpacked in a very low temperature
environment. In this case it is necessary to wait until the UPS is fully dried inside out before
proceeding installation and use. Otherwise there are hazards of electric shock.
NOTICE
:
UPS operation in sustained temperature outside the range of 15-25 C(59 -77 F)
reduces battery life.
2.4 Main Cabinet Installation
Two installation modes are available: Tower installation and Rack installation, depending on
available space and user considerations. You can select an appropriate installation mode according
to the actual conditions.
2.4.1 Tower Installation
Various installation configurations are available: single UPS, single UPS with single or multiple
battery cabinets. Their installation methods are all the same.
Please prepare support bases and spacers before installation
(1) Take out the support bases and spacers and then assemble the spacer and the support bases,
shown as Fig.2-1.