40

Figure 4-7 Energy flowing diagram of discharge

3) After about 60 seconds, the rectifier completes the start, and the inverter begins to start, and

after 30 seconds, the inverter complete the start, and supply the power to the output. The energy

flowing diagram is shown in Figure 4-8.

Figure 4-8 Energy flowing diagram of the start completed from batteries

4) Close the external output power supply isolators to supply the loads, and the system is working

in battery mode.

4.2 UPS Shut down

If need to shut down UPS completely, please first ensure the load is shut down correctly, and then

turn off the external battery breaker, the main input breaker (internal or external), the bypass input

breaker (internal or external, if have) one by one, the display screen will be off completely.

Note: If UPS in maintenance bypass mode, please also turn off the maintenance bypass breaker.

Summary of Contents for DRAGON POWER PLUS 15

Page 1: ...DRAGON POWER PLUS 15 15 KVA 60 KVA UPS USER MANUAL...

Page 2: ...ge of technical support and service Customers can contact our local office or customer service center for help The manual will update irregularly due to the product upgrading or other reasons Unless o...

Page 3: ...er who installs or operates the equipment should be well trained in electricity and safety and familiar with the operation debug and maintenance of the equipment Warning Label The warning label indica...

Page 4: ...roper environment more detail in section 2 3 Debug Operate Make sure the grounding cable is well connected before connecting the power cables the grounding cable and neutral cable must be in accordanc...

Page 5: ...utions should be followed implicitly at all times Particular attention should be paid to the recommendations concerning local environmental conditions and the provision of protective clothing first ai...

Page 6: ...glasses rubber gloves and skirt when operating the battery Otherwise you may become blind if acid enters your eyes and your skin may be damaged by the acid At the end of battery life the battery may...

Page 7: ...igurations are provided in Table 1 1 Table 1 1 UPS Configuration Item Components Quantity Remark 10 15kVA Circuit Breakers 4 Optional Dual Input 1 Standard Parallel Card 1 Optional Dry Contact Card 1...

Page 8: ...rear views The UPS front views are shown as Figure 1 1 Rear panel As shown in Figure 1 2 the UPS rear panel offers the following components SNMP Optional Parallel Optional RS485 RS232 USB Optional Co...

Page 9: ...2 1 UPS System Description The Rack UPS is configured by the following part Rectifier Charger Inverter Static bypass switch One or several battery strings should be installed to provide backup energy...

Page 10: ...ies DC power to the inverter while simultaneously FLOAT or BOOST charging its associated backup battery The Normal mode structure is shown in Fig 1 4 Figure 1 4 Normal mode operation diagram 1 2 2 2 B...

Page 11: ...ruption in power to the critical AC load Should the inverter be asynchronous with the bypass the static switch will perform a transfer of the load from the inverter to the bypass with power interrupti...

Page 12: ...ation diagram Danger During Maintenance mode dangerous voltages are present on the terminal of input output and neutral even with all the modules and the LCD turned off 1 2 2 5 ECO Mode To improve sys...

Page 13: ...inverter shuts down when the battery reaches the End of Discharge Voltage EOD The UPS may be programmed to System Auto Start Mode after EOD The system starts after a delay time when the AC mains recov...

Page 14: ...raturefor batteriesis 20 25 Operatingabove 25 will reduce the battery life and operation below 20 will reduce the battery capacity The battery will generate a little amount of hydrogen and oxygen at t...

Page 15: ...at least 0 5m of space on each side 3 Condensation to water drops may occur if the UPS is unpacked in a very low temperature environment In this case it is necessary to wait until the UPS is fully dr...

Page 16: ...unterclockwise and then insert it 2 4 2 Rack Installation Battery cabinets must be installed firstly because battery cabinets are too heavy And two or more installation personnel are required to insta...

Page 17: ...rom the middle of the batteries in series See Figure 2 4 Figure 2 4 Battery connection diagram Danger The battery terminal voltage is of more than 200Vdc please follow the safety instructions to avoid...

Page 18: ...described below Ambienttemperature 30 AC loss less than 3 DC loss less than1 The length of the AC power cables are no longer than 50 m and the length of the DC power cables are no longer than 30 m Cur...

Page 19: ...is open Attach necessary warning signs to these switches to prevent unauthorized operation 2 Open the back door of the cabinet remove the plastic cover The input and output terminal battery terminal a...

Page 20: ...local and national codes When the cable holes does not goes through by cables it should be filled by the protective ring 2 7 Control and Communication Cables The rear panel of the cabinet provides dry...

Page 21: ...losed function is settable Default Low battery alarming J8 2 BAT_LOW_ALARM_NO Output dry contact Normally open function is settable Default Low battery alarming J8 3 BAT_LOW_ALARM_GND Common terminal...

Page 22: ...ture detection R25 5Kohm B25 50 3275 please confirm with the manufacturer or contact the local maintenance engineers when placing an order Remote EPO Input Port J4 is the input port for remote EPO It...

Page 23: ...pen signal of BCB J6 2 2 GND_DRY Power ground for 24V J7 1 BCB_Online BCB on line input normally open BCB is on line when the signal is connecting with J7 2 J7 2 GND_DRY Power ground for 24V Battery W...

Page 24: ...ure2 16 and description is shown in Table 2 11 Figure 2 16 Integrated warning dry contact interface diagram Table 2 11 General alarm dry contact interface description Port Name Function J9 1 GENERAL_A...

Page 25: ...mmon input 3 phase in and 3 phase out dual input 3 phase in and 1 phase out common input 3 phase in and 1 phase out dual input 2 8 1 3 phase in and 3 phase out common input Use No 1 copper bar to conn...

Page 26: ...terminal J4 EPO c Close the external input breaker the LCD screen of the ups will be lighted connect the MTR software and set the related parameters as below Change UsedKva to 10 or 6 from 15 or 10 T...

Page 27: ...tion with the plastic rivet as shown in figure 2 18 Fig 2 17 Fix insulation film Fig 2 18 Graphic of insulation film fixed 4 Connect input phase A to No 6 copper bar then connect input phase B and pha...

Page 28: ...d 1 phase out dual input 3 Fix the insulating film accessory to the No 5 copper bar as shown in Figure 2 20 and fixed in the corresponding position with the plastic rivet as shown in figure 2 21 Fig 2...

Page 29: ...start operation key The front panel components of the UPS are described in table 3 1 Figure 3 1 Front panel of UPS Table 3 1 Description of front panel parts Item Name Description LCD Can operate cont...

Page 30: ...ct capacity operational mode and the time of the system WarningInformation Display the warning information of the cabinet MainMenu Main menu includes Cabinet Data Setting Log Operate and System Users...

Page 31: ...nd faults information and the data and time they occur and disappear Figure 3 4 Log Page The following Table 3 3 shows events of UPS History Log No LCD Display Explanation 1 Load On UPS Set Load On UP...

Page 32: ...lear Incident above disappears 26 Bypass Overload Tout Set Bypass Over Load Timeout 27 Byp Overload Tout Clear Incident above disappears 28 Byp Freq Over Track Set Bypass Frequency Over Track Range 29...

Page 33: ...otect Set Inverter Protect Inverter Voltage Abnormal or Power Back feed to DC Bus 68 Inverter Protect Clear Incident above disappears 69 Input Neutral Lost Set Input Grid Neutral Lost 70 Bypass Fan Fa...

Page 34: ...ay Connect Fail Set Relay in open circuit 98 Relay Connect Fail Clear Incident above disappears 99 Relay Short Circuit Set Relay shorted 100 Relay Short Circuit Clear Incident above disappears 101 No...

Page 35: ...touching the language icon COMM Device Address Setting the communication address RS232 Protocol Selection SNT Protocol Modbus Protocol YD T Protocol and Dwin For factoryuse Baud rate Setting the baud...

Page 36: ...ystem auto start mode after EOD UPS start mode after battery end of discharging RATE Configure the rated Parameter For the factory use CONFIGURE Display mode Support Tower and Rack LCD display Back li...

Page 37: ...arge days for running and hours of discharging TEST COMMAND Battery Test By touching the icon the system transfer to the Battery mode to test the condition of the battery Ensure the bypass is working...

Page 38: ...ss input breaker and then the system starts initializing if not please one by one to turn on Input breaker Bypass input breaker and then the system starts initializing 2 The LCD in front of the cabine...

Page 39: ...ter is running normally the UPS switches from the bypass to the inverter the bypass indicator bar is off and the load indicator bar flashes As shown in Figure 4 4 Figure 4 4 Normal mode 7 The startup...

Page 40: ...steps of the start up are as follow 1 Confirm the batteries are correctly connected and then close the external battery circuit breakers 2 Press and hold the red button of battery cold start until th...

Page 41: ...pleted from batteries 4 Close the external output power supply isolators to supply the loads and the system is working in battery mode 4 2 UPS Shut down If need to shut down UPS completely please firs...

Page 42: ...pass mode Note Normally the system will transfer to the Normal mode automatically This function is used when the frequency of the bypass is over track and when the system needs to transfer to Normal m...

Page 43: ...nal or from POD and the external battery breaker 2 After 30S the bypass indicator LED goes green and the load is powered through maintenance bypass breaker and static bypass 3 Turn off the maintenance...

Page 44: ...rocess automatically 4 5 Installation of parallel operation system Normally 4 cabinets can be paralleled and the parallel function is optional if users need the function please confirm the configurati...

Page 45: ...aintenance of the UPS please refer to Chapter 4 3 4 to transfer to maintenance bypass mode After maintenance re transfer to normal mode according to Chapter 4 3 5 5 3 Instruction for Maintaining Batte...

Page 46: ...sulfuric acid and disposed of in accordance with local regulations The waste lead acid battery is a kind of hazardous waste and is one of the major contaminants controlled by government Therefore its...

Page 47: ...40 2 Method of specifying the performance and test requirements of UPS IEC62040 3 Note The above mentioned product standards incorporate relevant compliance clauses with generic IEC and EN standards f...

Page 48: ...it Parameter Rated capacity kVA 10 15 Grid System 3 Phases Neutral Ground Rated AC Input Voltage Vac 208 220 three phaseandsharing neutral with the bypass input Rated Frequency Vac 50 60Hz Input volta...

Page 49: ...ttery Charge V cell 2 4V cell selectable from 2 3V cell 2 45V cell Constant current and constant voltage charge mode Battery Charging Power Max Current kW 10 UPS capacity selectable from 1 20 UPS capa...

Page 50: ...utral cable A 1 7 In Rated frequency Hz 50 60 Switch time between bypass and inverter ms Synchronized transfer 0ms Bypass voltage range Settable default 20 15 Upper limit 10 15 20 25 Lower limit 10 15...

Page 51: ...50 Interface Standard RS232 RS485 Dry Contact Option SNMP Parallel USB...

Page 52: ...is for single UPS and the other is for 2 UPS in parallel 1 POD for single system The outlook of POD for single system is shown as Figure 1 A Front view with the cover B Front view without the cover T...

Page 53: ...n terminal occurs MAIN INPUT mA mB mC mN BYPASS INPUT bA bB bC bN OUTPUT oA oB oC oN Ground PE Note For the factory default configuration mA and bA mB and bB mC and bC are short connected by the coppe...

Page 54: ...he UPS user manual 1 3 phase input and 3 phase output with common input a Please refer tothe diagram below connect oA oB oC oN mN mA mB mC PE on the bottom connection terminal row of POD to the corres...

Page 55: ...nection these copper sheets are optional they are named 3 1 kit for UPS and 3 1 kit for single POD 3 1 kit for UPS contains 4 blocks of copper sheets they are named UPS 4 UPS 5 UPS 6 UPS 7 3 1 kit for...

Page 56: ...corresponding positions on the UPS 4 3 phase input and 1 phase output with dual input NOTE The UPS and COPare both configured as the type of 3 phase input and 3 phase output as default If configuring...

Page 57: ...et UPS 7 g Short bA bB and bC on the UPS connection terminal row with the copper sheet UPS 5 h Connect oA and oB on the bottom connection terminal row of POD to the copper sheet UPS 4 with cables i Co...

Page 58: ...e cover The cover is attracted by magnet on the both side Remove the cover 7 breakers occur they are MAIN INPUT breaker BYPASS INPUT breaker and OUTPUT breaker on the top row from left to right They a...

Page 59: ...ver Remove the protective cover the connection terminal occurs MAIN INPUT mA mB mC mN BYPASS INPUT bA bB bC bN OUTPUT oA oB oC oN Ground PE Note For the factory default configuration mA and bA mB and...

Page 60: ...re are 4 kinds of cable connections NOTE Before connecting the cables please first confirm the configuration of the UPS generally the UPSis configured as the type of 3 phase input and 3 phase output 3...

Page 61: ...necting UPS2 and the third is for connecting UPS1 a Please refer to the diagram below connect oA oB oC oN mN mA mB mC PE on the third connection terminal row of POD to the corresponding positions on t...

Page 62: ...mB and bB mC and bC of COP and UPS b Connect oA oB oC oN mN bN mA bA mB bB mC bC PE on the third connection terminal row of POD to the corresponding positions on the UPS1 c Connect oA oB oC oN mN bN...

Page 63: ...heet POD B3 c Short oC oN mN and bN on the top connection terminal row of POD with the copper sheet POD B4 d Short mA bA bB and bC on the top connection terminal row of POD with the copper sheet POD B...

Page 64: ...these copper sheets are optional they are named 3 1 kit for UPS and 3 1 kit for single POD 3 1 kit for UPS contains 4 blocks of copper sheets they are named UPS 4 UPS 5 UPS 6 UPS 7 3 1 kit for parall...

Page 65: ...Short bA bB and bC on the UPS connection terminal row with the copper sheet UPS 5 h Connect oA and oB on the bottom connection terminal row of POD to the copper sheet UPS 4 with cables i Connect oC o...

Page 66: ...65...

Page 67: ...www lbspower com Espa ol English...

Reviews: