19
2.
Fasten a diagonal brace
20
to the bottom rung of the first basic
tower and to the second rung from below of the second basic tower.
3.
Snap in the access deck
24
at the second cross-rung from below of
the upper basic tower.
4.
Open the third basic tower
9
and firmly snap in the joint in the
folding part. Attach it at an angle of 180° to the second basic tower.
Secure the joints with spring clips
15
.
5.
Fasten a diagonal brace
19
to the bottom rung of the second basic
tower and to the second rung from below of the third basic tower.
Install the diagonal brace opposite to the first diagonal brace.
6.
To complete the working platform, install 3 guardrails
16
, toe boards
25
and end toe boards
26
.
1.
Open the second basic tower
9
and firmly snap in the joint in the
folding part. Attach it at an angle of 180° to the first basic tower.
Secure the joints with spring clips
15
.
Further assembly
Tower model 625
Summary of Contents for ZIFA
Page 15: ...15...
Page 31: ...31 14 ZERTIFIKAT...
Page 47: ...15...
Page 63: ...31 14 CERTIFICATE...
Page 79: ...15...
Page 95: ...31 14 CERTIFICADO...