18
1.
Open the second basic tower
9
and firmly snap in the joint in the
folding part. Attach it at an angle of 180° to the first basic tower.
Secure the joints with spring clips
15
.
2.
Snap in the access deck
24
at the second cross-rung from below of
the upper basic tower.
3.
To complete the working platform, install 3 guardrails
16
, toe boards
25
and end toe boards
26
.
1.
Open the second basic tower
9
and firmly snap in the joint in the
folding part. Attach it at an angle of 180° to the first basic tower.
Secure the joints with spring clips
15
.
During assembly and dismantling, system decks or scaffolding
planks according to DIN 4420-3 (minimum dimensions 28 x 4.5 x
220 cm) must be installed as auxiliary decks at maximum height
intervals of 2.0 m. These auxiliary decks provide a safe footing
for assembly and dismantling, and must be removed again after
assembly. Each platform must be completely boarded.
Further assembly
Tower model 623
Further assembly
Tower model 624
Summary of Contents for ZIFA
Page 15: ...15...
Page 31: ...31 14 ZERTIFIKAT...
Page 47: ...15...
Page 63: ...31 14 CERTIFICATE...
Page 79: ...15...
Page 95: ...31 14 CERTIFICADO...