5.4 Power supply connection
Open the control desk, connect the wires according
to the electrical diagram. After check the connection,
switch on the power. Turn on the power supply
switch which is on the panel of control desk. The
indict light will turn on.
Power switch is needed, and installed near control
desk. Cut the power when maintenance or
emergency. The damage which is caused by wrong
wire connection is not covered by warranty.
Make sure the oil level is above the standard level.
DO NOT operate the lift if oil tank is empty.
Fix all the oil hoses and press UP button, test the
electrical parts: if motor does not operate, abnormal
sound, platform does not rise, motor is hot, STOP
operating immediately and check the wire
connection.
Fig.8
Notice:
High voltage in control desk, ground lead must be safe.
8 leters oil is needed in the first use, fill the oil and make
sure the oil level is above the standard level.
5.5 Anchoring
Wrap the oil fittings, cable connections and joints of
the lift to prevent dusts from getting in.
Raise the platforms to 1.5m, then install the anchor
bolts.
With the help of the holes on the base plate, drill and
install the anchor bolts. In the process of drilling,
make sure that there is no movement at the base
frames. Fasten the base frames of the lift to the
pits with 8 M16*120
(
M0.63″X4.7″
)
anchor bolts.
Rotate the adjusting bolts, adjust the platform to
same level, the equalization should less than 3mm
(0.1”). Choose a right shim and place it under frame.
Insert the shims at both sides of anchor bolt.
Tighten out the nuts to fix the base frames on the
floor.
Cautions: To ensure safety and performance, follow the
installation procedures step by step.
Wear safety goggles.
Use strong alloy drill bit with a diameter of 18mm
(
0.71″
)
. Do not use worn-out drill bit.
Keep the hammer drill upright with the surface of the
hole.
Keep hammer drill going by itself. Do not apply
extra pressure.
Control Panel
1
5
3
7
7
9
7
13
Mother Board
7
13