background image

LAUNCH

 

 

                                                

               TLT632AF  INSTALLATION 

MANUAL 

 

                                                  15 

Electrical diagram 

 

 

NO. 

ERP CODE 

NAME 

201 

102130034 

Transformer   

202 

102270004 

Rectifier   

203 

103180018 

Connecting board 

204 

102110059 

Contactor 

205 

102150053 

Fuse 

206 

102240039 

Solenoid valve 

207 

102100137 

Button 

208 

102100087 

Power switch 

209 

102140018 

Alarm 

210 

102990065 

Indicating light 

211 

103160033 

Solenoid air valve 

212 

102100135 

Button 

213 

102100136 

Button 

 

Equipment record (6 pages) attached. 

Summary of Contents for TLT632AF

Page 1: ...2 5 Pneumatic Diagram 6 3 Tools 7 4 Unpacking 7 5 Installation 7 5 1 Basic Requirements 7 5 2 Installation Procedures 7 5 2 1 Base Frame Installation 7 5 2 2 Control Desk Installation 8 5 2 3 Hydrauli...

Page 2: ...facturer may lead to direct or indirect damage to the product Installation and adjustment personnel should have an understanding of electronic equipment Never allow untrained personnel to operate the...

Page 3: ...LAUNCH TLT632AF INSTALLATION MANUAL 3 2 Structure and Working Principle 2 1 Structure Fig 1...

Page 4: ...platform upward Release button SB1 the platform will stop rise Keep pushing button SB1 when the platform reaches at the Max height release valve will be activated and protect the lift Safety Locking p...

Page 5: ...LAUNCH TLT632AF INSTALLATION MANUAL 5 2 3 Hydraulic Diagram 1 2 3 4 5 6 7 7 8 8 9 9 10 10 P 11 Z1 Z2 F2 F1 Fig 3 2 4 Hydraulic Components in Control Desk Fig 4 F2 Z2 Z1 F1...

Page 6: ...wering valves 9 to lower the lift slowly and carefully The lowering speed can be adjusted by speed valve 11 To equalize two platforms open 2 equalization valves 8 raise the lift up and down 1 or 2 tim...

Page 7: ...tolerance of the concrete floor levelness should not exceed 5mm 0 2 Slight slope can be corrected with shims Excessive slope on the ground will greatly affect the performance of the lift In this case...

Page 8: ...olerance should less than 6mm 0 24 Drawing the frame is very important Poor drawing will cause many problems about assembly and operation 5 3 Control Desk Installation Place the control desk in place...

Page 9: ...d make sure the oil level is above the standard level 5 5 Anchoring Wrap the oil fittings cable connections and joints of the lift to prevent dusts from getting in Raise the platforms to 1 5m then ins...

Page 10: ...jected Refer to Fig 4 and cylinder adjustment adjust the platforms to the same level Notice Attention should be paid to the position of oil pipes and hydraulic hose when the platforms move to the mini...

Page 11: ...ical equipment Also do not wear any ring watch or bracelet while operating electrical equipment 8 Parts List This parts list is only to be used by maintenance and servicing personnel The manufacturer...

Page 12: ...19 Sliding block 16 201021437 Platform 17 104991230 Supporting block 18 201021502 Platform 19 201021439 Supporting bracket 20 Y201013184D Connecting axle 21 103202061 Spring 22 103202063 Cylinder asse...

Page 13: ...pe bending head 3 5M high pressure oil hose 103 103260188 C type 2M high pressure oil hose 104 103260189 C type bending head 2 5M high pressure oil hose 105 103260193 C type 0 8M high pressure oil hos...

Page 14: ...LAUNCH TLT632AF INSTALLATION MANUAL 14 103990191 Power unit assembly 220V 60Hz three phase 103990192 Power unit assembly 220V 60Hz single phase 103990193 Power unit assembly 200V 60Hz single phase...

Page 15: ...tifier 203 103180018 Connecting board 204 102110059 Contactor 205 102150053 Fuse 206 102240039 Solenoid valve 207 102100137 Button 208 102100087 Power switch 209 102140018 Alarm 210 102990065 Indicati...

Reviews: