The depth of the hole depends on the length of the 
bolt.    It is advisable that the bolts above the base 
frames should be around 30mm (1.2”). 

 

Remove the dust from the holes. 

 

Tap the bolt into the hole, insert and hit the core until 
the bolt fully expands 

   

Fig.9 

 

6 Adjustment

 

 

6.1  

Preparation

 

 

Lubricate the moving surface of the roller with #2 
lithium lubricant.  Lubricant should be applied 
evenly from left to right. 

 

Lubricate the joints of the lifts with #2 lithium 
lubricant. 

 

Check the oil tank for enough hydraulic oil. 

 

6.2  

Adjustment Procedures

 

 

Check if all the connection bolts are tightly fastened. 

 

Press UP button, the platforms are raising; release 
the UP button, the platforms stop raising. Press 
DOWN button, the platforms are lowering. 

 

If  there is air in hydraulic system  due to new 
installation,  air bleeding  performance is needed.  
The air in the master cylinder can be bled after the 
platform goes up and down several times.    The air 
in the slave cylinder can be bled by following steps: 
lift  Master Platform close to the maximal height;  
unscrew the two exhaust screws severally. Screw 
the exhaust screw when the all the air are ejected. 

 

Refer to Fig.4 and cylinder adjustment, adjust the 
platforms to the same level. 

Notice: 
Attention should be paid to the position of oil pipes and 
hydraulic hose when the platforms move to the minimal 
height for the first time.    Make sure they don not get stuck 
with platforms moving downwards. 
When bleeding the air in the cylinders, can NOT unscrew 
the two exhaust screws at the same time or operate the lift 
when the exhaust screws are unscrewing. 

7. Safety Rules for Electrical 

Control System 

1.

 

Only personnel who are properly trained and have 
adequate knowledge and skill should undertake all 
electrical/electronic troubleshooting and repair. 

2.

 

Do not alter or bypass protective interlocks. 

3.

 

Before starting, read and observe all warning labels. 

4.

 

When trouble shooting make sure the power source has 
been disconnected and main switch has been locked. 

5.

 

Take extra precautions in damp areas to protect you from 
accidental grounding. 

6.

 

Before applying power to any equipment it must be 
established, without a doubt, that all persons are clear. 

7.

 

Do not open the electrical control panel unless it is 
necessary to check the electrical equipment. 

8.

 

Do not alter the electrical circuits unless authorized to do 
so by the manufacturer. 

9.

 

When replacing electrical components, make sure they 
conform to the manufacturer’s specifications, including 
proper color coding. 

Summary of Contents for TLT632AF

Page 1: ...2 5 Pneumatic Diagram 6 3 Tools 7 4 Unpacking 7 5 Installation 7 5 1 Basic Requirements 7 5 2 Installation Procedures 7 5 2 1 Base Frame Installation 7 5 2 2 Control Desk Installation 8 5 2 3 Hydrauli...

Page 2: ...facturer may lead to direct or indirect damage to the product Installation and adjustment personnel should have an understanding of electronic equipment Never allow untrained personnel to operate the...

Page 3: ...LAUNCH TLT632AF INSTALLATION MANUAL 3 2 Structure and Working Principle 2 1 Structure Fig 1...

Page 4: ...platform upward Release button SB1 the platform will stop rise Keep pushing button SB1 when the platform reaches at the Max height release valve will be activated and protect the lift Safety Locking p...

Page 5: ...LAUNCH TLT632AF INSTALLATION MANUAL 5 2 3 Hydraulic Diagram 1 2 3 4 5 6 7 7 8 8 9 9 10 10 P 11 Z1 Z2 F2 F1 Fig 3 2 4 Hydraulic Components in Control Desk Fig 4 F2 Z2 Z1 F1...

Page 6: ...wering valves 9 to lower the lift slowly and carefully The lowering speed can be adjusted by speed valve 11 To equalize two platforms open 2 equalization valves 8 raise the lift up and down 1 or 2 tim...

Page 7: ...tolerance of the concrete floor levelness should not exceed 5mm 0 2 Slight slope can be corrected with shims Excessive slope on the ground will greatly affect the performance of the lift In this case...

Page 8: ...olerance should less than 6mm 0 24 Drawing the frame is very important Poor drawing will cause many problems about assembly and operation 5 3 Control Desk Installation Place the control desk in place...

Page 9: ...d make sure the oil level is above the standard level 5 5 Anchoring Wrap the oil fittings cable connections and joints of the lift to prevent dusts from getting in Raise the platforms to 1 5m then ins...

Page 10: ...jected Refer to Fig 4 and cylinder adjustment adjust the platforms to the same level Notice Attention should be paid to the position of oil pipes and hydraulic hose when the platforms move to the mini...

Page 11: ...ical equipment Also do not wear any ring watch or bracelet while operating electrical equipment 8 Parts List This parts list is only to be used by maintenance and servicing personnel The manufacturer...

Page 12: ...19 Sliding block 16 201021437 Platform 17 104991230 Supporting block 18 201021502 Platform 19 201021439 Supporting bracket 20 Y201013184D Connecting axle 21 103202061 Spring 22 103202063 Cylinder asse...

Page 13: ...pe bending head 3 5M high pressure oil hose 103 103260188 C type 2M high pressure oil hose 104 103260189 C type bending head 2 5M high pressure oil hose 105 103260193 C type 0 8M high pressure oil hos...

Page 14: ...LAUNCH TLT632AF INSTALLATION MANUAL 14 103990191 Power unit assembly 220V 60Hz three phase 103990192 Power unit assembly 220V 60Hz single phase 103990193 Power unit assembly 200V 60Hz single phase...

Page 15: ...tifier 203 103180018 Connecting board 204 102110059 Contactor 205 102150053 Fuse 206 102240039 Solenoid valve 207 102100137 Button 208 102100087 Power switch 209 102140018 Alarm 210 102990065 Indicati...