4 Unpacking
The lift is delivered in one package: 2 platforms
(with hydraulic hoses) and 1 control desk connected
together.
Unpack according to the instructions on the
packages. Remove the packing materials and
check for damage and loss of components.
To avoid accidents from occurring, keep the packing
material away from children. The packing materials
need to be disposed of properly if they may
contaminate the environment.
5 Installation
5.1 Basic Requirements
Fig.6
The lift can only be installed on concrete floor with a
minimal thickness of 200mm
(
7.9”
)
and at least 7
days of solidification time.
The strength of the concrete ground should exceed
3000PSI (2.1kgf/mm
2
)
The tolerance of the concrete floor levelness should
not exceed 5mm (0.2”). Slight slope can be
corrected with shims. Excessive slope on the
ground will greatly affect the performance of the lift.
In this case, new concrete slab should be made.
Inspect for possible hindrance such as low ceiling,
overhead pipelines in the work area, passageways
and escapes. The working area of the lift should be
4.2m(165.4”) high to give enough space.
Allow enough space (1.5m/59”) at the front and back
and left and right of the lift so that operation should
not be hindered.
Power supply: Put the power source in place before
installation. All the wiring should be performed by a
qualified electrician.
It is default installation, the control unit could be
installed at the right side of lift as well. The
installation should be performed by qualified people.
5.2 Base Frame Installation
Fig.7
Layout plan: Refer to the Total width 2020mm (79.5”),