background image

LAUNCH

 

 

                                                

               TLT632AF INSTALLATION MANUAL 

 

                                                  7 

4 Unpacking

 

 

The lift is delivered in one package:     2 platforms 
(with hydraulic hoses) and 1 control desk connected 
together. 

 

Unpack according to the instructions on the 
packages.    Remove the packing materials and 
check for damage and loss of components. 

 

To avoid accidents from occurring, keep the packing 
material away from children.    The packing materials 
need to be disposed of properly if they may 
contaminate the environment. 

5 Installation

 

5.1 Basic Requirements

 

 

           Fig.6 

 

The lift can only be installed on concrete floor with a 
minimal thickness of 200mm

7.9”

  and at least 7 

days of solidification time.   

 

The strength of the concrete ground should exceed 
3000PSI (2.1kgf/mm

2

 

The tolerance of the concrete floor levelness should 

not exceed 5mm  (0.2”).  Slight slope  can be 
corrected with shims.  Excessive slope  on the 
ground will greatly affect the performance of the lift.   
In this case, new concrete slab should be made. 

 

Inspect for possible hindrance such as low ceiling, 
overhead pipelines in the work area, passageways 
and escapes.    The working area of the lift should be 
4.2m(165.4”) high to give enough space. 

 

Allow enough space (1.5m/59”) at the front and back 
and left and right of the lift so that operation should 
not be hindered. 

 

Power supply: Put the power source in place before 
installation. All the wiring should be performed by a 
qualified electrician. 

 

It is default installation,  the control unit could be 
installed at the right side of lift as well. The 
installation should be performed by qualified people. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                    

5.2 Base Frame Installation 

 

             Fig.7 

 

Layout plan: Refer to the Total width 2020mm (79.5”), 

Summary of Contents for TLT632AF

Page 1: ...2 5 Pneumatic Diagram 6 3 Tools 7 4 Unpacking 7 5 Installation 7 5 1 Basic Requirements 7 5 2 Installation Procedures 7 5 2 1 Base Frame Installation 7 5 2 2 Control Desk Installation 8 5 2 3 Hydrauli...

Page 2: ...facturer may lead to direct or indirect damage to the product Installation and adjustment personnel should have an understanding of electronic equipment Never allow untrained personnel to operate the...

Page 3: ...LAUNCH TLT632AF INSTALLATION MANUAL 3 2 Structure and Working Principle 2 1 Structure Fig 1...

Page 4: ...platform upward Release button SB1 the platform will stop rise Keep pushing button SB1 when the platform reaches at the Max height release valve will be activated and protect the lift Safety Locking p...

Page 5: ...LAUNCH TLT632AF INSTALLATION MANUAL 5 2 3 Hydraulic Diagram 1 2 3 4 5 6 7 7 8 8 9 9 10 10 P 11 Z1 Z2 F2 F1 Fig 3 2 4 Hydraulic Components in Control Desk Fig 4 F2 Z2 Z1 F1...

Page 6: ...wering valves 9 to lower the lift slowly and carefully The lowering speed can be adjusted by speed valve 11 To equalize two platforms open 2 equalization valves 8 raise the lift up and down 1 or 2 tim...

Page 7: ...tolerance of the concrete floor levelness should not exceed 5mm 0 2 Slight slope can be corrected with shims Excessive slope on the ground will greatly affect the performance of the lift In this case...

Page 8: ...olerance should less than 6mm 0 24 Drawing the frame is very important Poor drawing will cause many problems about assembly and operation 5 3 Control Desk Installation Place the control desk in place...

Page 9: ...d make sure the oil level is above the standard level 5 5 Anchoring Wrap the oil fittings cable connections and joints of the lift to prevent dusts from getting in Raise the platforms to 1 5m then ins...

Page 10: ...jected Refer to Fig 4 and cylinder adjustment adjust the platforms to the same level Notice Attention should be paid to the position of oil pipes and hydraulic hose when the platforms move to the mini...

Page 11: ...ical equipment Also do not wear any ring watch or bracelet while operating electrical equipment 8 Parts List This parts list is only to be used by maintenance and servicing personnel The manufacturer...

Page 12: ...19 Sliding block 16 201021437 Platform 17 104991230 Supporting block 18 201021502 Platform 19 201021439 Supporting bracket 20 Y201013184D Connecting axle 21 103202061 Spring 22 103202063 Cylinder asse...

Page 13: ...pe bending head 3 5M high pressure oil hose 103 103260188 C type 2M high pressure oil hose 104 103260189 C type bending head 2 5M high pressure oil hose 105 103260193 C type 0 8M high pressure oil hos...

Page 14: ...LAUNCH TLT632AF INSTALLATION MANUAL 14 103990191 Power unit assembly 220V 60Hz three phase 103990192 Power unit assembly 220V 60Hz single phase 103990193 Power unit assembly 200V 60Hz single phase...

Page 15: ...tifier 203 103180018 Connecting board 204 102110059 Contactor 205 102150053 Fuse 206 102240039 Solenoid valve 207 102100137 Button 208 102100087 Power switch 209 102140018 Alarm 210 102990065 Indicati...

Reviews: