LAUNCH
Installation Instruction for Economical Symmetric Floor-plate 2-post Lift
i
Table of contents
1. Precaution………………………………………………1
2. Structure and working Principle.………………2
2.1 Structure Schematic Diagram…….……………………2
2.2 Main Structure and Principle of the Equipment...……3
3 Tools for installation and adjustment………………4
4. Unpacking…………………………………………….4
5. Installation…………….………………………………4
5.1 Important notice……………………………………4
5.2 Installation Procedure…………………………………4
5.2.1 Selecting installation site …………………………...4
5.2.2 Base plate layout……………………………………...5
5.2.3 Install the powerside column………………………….5
5.2.4 Install the floor plate…….………………………………6
5.2.5 Install the offside column………………………………6
5.2.6 Install and adjust the balancing steel cables………7
5.2.7 Install the power unit………………….…..………..…7
5.2.8 Connecting the power supply…………………………7
5.2.9 Connecting the hydraulic lines………………………...8
5.2.10 Install the swing arm and guardrail…………………..9
5.2.11 Adjust the steel chain…………………………………6
5.2.12 Install the floor plate cover…………………………9
6. Lift Adjustment……….……………………………….10
6.1 Preparation before adjustment……………………10
6.2 Adjustment procedure…………………………………10
7. List of the lift components………………………11
Diagram of the electrical system TLT235/TLT240SB...16
Diagram of the hydraulic system TLT235/TLT240SB…17