background image

LAUNCH  

Installation Instruction for Economical Symmetric Floor-plate 2-post Lift

 

14 

No

 

Material coding No

 

Name

 

11MC126D 

TLT235SB Powerside column

 

11MC124D

 

TLT240SB Powerside column 

11MC127C 

TLT235SB Offside column

 

11MC125C

 

TLT240SB Offside column 

 

 

 

 

 

 

 

 

 

 

 

 

7 11MC045

C

 

Floor plate

 

11MC044

C

 

Floor plate cover

 

11MC544A 

Top plate assembly

 

10 

11AC082A 

Nut M12

 

11 

11BC111B 

Top pulley

 

12 

11AD096A 

Bushing 2520

 

13 

11AD223A 

Retaining ring 25

 

14 

 11BE055B 

Washer

 

 

 

 

 

 

 

17 

11AD065A 

Flat washer 12

 

18 

11AD

090

Spring washer 12

 

19 

11AB376A 

Bolt M12

×

35

 

20 

11AD056A 

Flat washer 10

 

21 11AD

116

Spring washer 10

 

22 

11AB375A 

Bolt M10

×

25

 

23 

11AJ

072

Steel cable

 

24 11AB

969

Anchor bolt  M18

×

160

 

25 11BE108

B

 

Cover of hose 

26 11AB790A 

Screw M5X12 

27 11AD208A 

Washer5 

101

 

10AX459A 

Power unit 

102 

11AJ435A 

Fitting 

103 

12AE697A 

HP hose 

104 16BG076A 

Flow control fitting 

105 

11AD099A 

Seal14 

106 

11AD098A 

Bushing 3052 

107 

12AE696A 

HP hose 

108 

16BG078A 

Main hydraulic cylinder 

109 16BG079A 

Auxiliary hydraulic cylinder 

110 

11BD281B 

Sheave seat 

111 

11AD171A 

Retaining ring 32 

112 

11AD092A 

Retaining ring 30 

No

 

Material coding No

 

Name

 

Summary of Contents for TLT235SB

Page 1: ...te layout 5 5 2 3 Install the powerside column 5 5 2 4 Install the floor plate 6 5 2 5 Install the offside column 6 5 2 6 Install and adjust the balancing steel cables 7 5 2 7 Install the power unit 7...

Page 2: ...cause direct or indirect damage to the machine and injury on operators z To do the installation and adjustment the personnel must have certain electrical knowledge z The operators must undergo special...

Page 3: ...and working principles 2 1 Structure schematic diagram TLT235SB TLT240SB the Floor plate two post lift structure is shown below Figure 1 Figure2 SWING ARM FLOOR PLATE CARRIAGE 3370 min110 LIFTING PAD...

Page 4: ...point of the vehicle and then adjust the screw height below the pad to adapt to different heights of vehicle chassis z Balancing mechanism To keep the balance during the lifting and lowering process...

Page 5: ...treated properly 5 Installation 5 1 Important notice z The wrong installation will cause the lift damage or personal injury The manufacturer will not undertake any responsibilities for any damage caus...

Page 6: ...4 3 5 Fig 4 5 2 2 Base plate layout As shown in Fig 4 z With total width A as the basis draw two parallel lines 1 and 2 on the concrete slab with the error within 3mm z Determine the powerside column...

Page 7: ...only use the torque wrench and don t use impact tool for fastening Insert proper shims under the base of column if necessary making the column vertical Note The thickness of shims shouldn t exceed 5mm...

Page 8: ...teel cables as shown in Fig 6 z Adjust the tension of cables through the adjustment nuts on each end of steel cable The steel cables should be tight in equal tension Each steel cable should be ensured...

Page 9: ...f the lift is used outdoors it is recommended to set a cover on the power unit such damages to the motors caused by the water or other liquids like the detergent acid etc are not covered by warranty 5...

Page 10: ...sted properly by the manufacture Fig 10 making the swing arm move freely at the lowest height without scratching the ground The customer can make fine adjustment for chains after the electrical and hy...

Page 11: ...d the carriage rises stop pressing the button then the carriage will stop In order to lower down the carriage first pull the steel rope for the safety locks on the two carriages one time for each In c...

Page 12: ...f the lift components This list is only used as the information for the maintenance and repair Our company will not be liable for other uses In case of damages to the components purchase can be made f...

Page 13: ...LAUNCH Installation Instruction for Economical Symmetric Floor plate 2 post Lift 12...

Page 14: ...LAUNCH Installation Instruction for Economical Symmetric Floor plate 2 post Lift 13...

Page 15: ...r 17 11AD065A Flat washer 12 18 11AD090A Spring washer 12 19 11AB376A Bolt M12 35 20 11AD056A Flat washer 10 21 11AD116A Spring washer 10 22 11AB375A Bolt M10 25 23 11AJ072B Steel cable 24 11AB969A An...

Page 16: ...ssembly 210 11BC154B Pin axle 211 11MC128B Swing arm 212 11AE039B Spring 213 11BE112A Gear block 214 11AG528A Pin 5X40 215 11AD093A Returning ring 40 216 11AG011A Pin 3 26 218 11AD126A Washer 8 219 11...

Page 17: ...lve 5 safety valve 6 manual lowering valve 7 Sevo flow control valve 8 hose 9 hydraulic cylinder 10 level gauge 11 air filter Working principles of hydraulic system When the button is pressed to start...

Reviews: