![background image](http://html2.mh-extra.com/html/laserbit/lb-series/lb-series_user-manual_3747722033.webp)
LaserBit LB Series 4.3 page
33
•
Put the four M4,5x70 cross
headed self-tapping-screws
through the four free holes of
the metal plate
•
Pull up the four 6x15 spacers
(the shorter ones) to the screws
•
Tight the screws into the wall-
plugs, and tight it up as strong
as possible for the appropriate
fastening
S
S
t
t
r
r
u
u
c
c
t
t
u
u
r
r
e
e
o
o
f
f
t
t
h
h
e
e
g
g
r
r
o
o
m
m
m
m
e
e
t
t
s
s
Connecting the head to the ODIU, and the ODIU to the power
supply
Ensure that the cables are connected as it seen below.
For the power connection recommended to use
three-wired Ø0,75mm cables. The order of the
connection can be seen on the figure.
•
P – Phase
•
N - Neutral
The necessary power can be supported to the head by
the connector which can be seen in the figure next to
this text. Order of the cables from the head: (the four-
twisted-pair-wired cable)
•
Red - +12V
•
Twisted green-yellow - GND
•
Black - -12V
10.2.3
Fixing the heads
Your
LB-1500
head can be fixed to its stand
with an Alignment Base Unit (ABU). On the
figure you can see an ABU, and a plinth of a
LB-1500
unit, and the necessary fixing parts.
The necessary nuts and washers can be found
on the legs of the head. The steps of the fixing
are:
•
First, fix the ABU to the stand using the
washers and nuts
•
Place the head to the ABU
•
Fix the bolts with the nuts, using the
washers
•
Tight up all the nuts.