2-10
F-1097-2305
ASSEMBLY
Dual Wheel Kit - Optional
WARNING
NOTE
The Tire and Wheel Assembly is mounted with the valve
stem facing outward from the Hub and Spindle Assembly.
IMPORTANT
Torque will drop after the first 10 hours of operation.
Check the Wheel Bolts for proper torque after this
interval and re-tighten them.
Additional Tire and Wheel Assemblies can be added to
the Rockshaft Wheel Arms. Tires are 9.5L-15, 8 Ply
Rating and should be inflated to 44 PSI.
1. Lower the Till 'N Seed.
2. Apply Anti-Seize to the end of the Spindle.
3. Install a Hub and Spindle Assembly into each
Rockshaft Wheel Arm Sleeve. Secure with 3/8-16 x 3
Bolt and Locknut.
4. Install a Tire and Wheel Assembly onto each Hub with
1/2-20 x 1 Wheel Bolts. Tighten Wheel Bolts to 50
Ft-Lbs using the Sequence in
Then
tighten to a full torque of 80-85 Ft-Lbs.
Figure 2-13: Dual Wheel Assembly
Use a torque wrench to assure proper torque.
Insufficient torque can cause stud breakage and
damage the wheel pilots. Over torque can stress
the Bolts and strip the threads.
Wheel Bolts,
1/2-20 x 1
Hub and Spindle
Assembly
Bolt,
3/8-16 x 3
Locknut,3/8
Tire and Wheel Assemblies
Summary of Contents for Brilllion Till'N Seed BPSB-8
Page 4: ......
Page 18: ...1 12 F 1097 2305 SAFETY INFORMATION TABLE OF CONTENTS Table provided for general use NOTES...
Page 32: ...2 14 F 1097 2305 ASSEMBLY TABLE OF CONTENTS Table provided for general use NOTES...
Page 72: ...4 20 F 1097 2305 MAINTENANCE TABLE OF CONTENTS Table provided for general use NOTES...