![Landoll Brillion SSB Operator'S Manual Download Page 46](http://html1.mh-extra.com/html/landoll/brillion-ssb/brillion-ssb_operators-manual_3577254046.webp)
2-24
1P480rev0718
ASSEMBLY
Agitator Box
Installation of the Agitator (Brome) Box: Loose parts are
shipped in a bag assembly placed in the left seed box.
1. Remove bolts holding rear panel to deflector shield
assembly and reverse rear panels so that upper lips
flare rearward instead of forward.
2. Install coupling on transmission output shaft and
secure with 1/4” x 1-1/2 Roll Pin.
3. Loosen U-Bolts which fasten front seed box to frame
at center and right end. Replace center and right end
support brackets with extended supports which also
have holes for mounting a 2nd box (part 9K853 and
9K854).
Figure 2-30: Deflector Shield
Figure 2-31: Coupling Transmission
Single Box
Configuration
Rear Deflector
reversed to add
Brome Box
[
5ROO3LQ
&RXSOLQJ
Summary of Contents for Brillion SSB
Page 2: ......
Page 6: ......
Page 22: ...1 16 1P480rev0718 INTRODUCTION AND SAFETY INFORMATION Table provided for general use NOTES...
Page 31: ...ASSEMBLY 1P480rev0718 2 9 Table provided for general use NOTES...
Page 37: ...ASSEMBLY 1P480rev0718 2 15 Table provided for general use NOTES...
Page 45: ...ASSEMBLY 1P480rev0718 2 23 Table provided for general use NOTES...
Page 62: ...2 40 1P480rev0718 ASSEMBLY Table provided for general use NOTES...
Page 79: ...OPERATION 1P480rev0718 3 17 Figure 3 15 Rear Agitator Seed Chart...
Page 86: ...3 24 1P480rev0718 OPERATION Table provided for general use NOTES...
Page 100: ...5 4 1P480rev0718 REFERENCE TABLES AND SPECIFICATIONS Table provided for general use NOTES...