![Landoll Brillion SSB Operator'S Manual Download Page 32](http://html1.mh-extra.com/html/landoll/brillion-ssb/brillion-ssb_operators-manual_3577254032.webp)
2-10
1P480rev0718
ASSEMBLY
Warning Lamp Installation, 8 Ft
and 10 Ft
NOTE
10 Ft Drawbar model is shown, 10 Ft 3Pt, 8 Ft Drawbar
and 8 Ft 3Pt models similar.
1. Attach longer Light Bracket to the Transmission
located on the left side of the Seeder, with 3/8-16 x
1-1/4 Bolts, Lock Washers and Nuts.
2. Attach an Amber Lamp to the upper portion of the
longer Light Bracket with 1/4-20 x 1-1/4 Bolts and
Locknuts.
3. Attach an Red Lamp below the Amber Lamp with
1/4-20 x 1-1/4 Bolts and Locknuts. Ensure Red Lamp
lenses faces rearward.
4. On the right side of the Seeder attach the shorter
Light Bracket to the Angle Bracket with 1/2-13 x 1-1/4
Bolts, Lock Washers and Nuts.
5. Attach an Amber Lamp to the upper portion of the
Light Bracket with 1/4-20 x 1-1/4 Bolts and Locknuts.
6. Attach an Red Lamp below the Amber Lamp with
1/4-20 x 1-1/4 Bolts and Locknuts. Ensure Red Lamp
lenses faces rearward.
7. Attach the Light Module to the Module Bracket with
1/4-20 x 1-1/2 Bolts and Locknuts.
8. Layout the Lamp Harness, noting that the connectors
marked with Green Tape is Right Side and Yellow
Tape is Left Side.
9. Connect the Lamp Harness into the Light Module,
route the plugs with Green Tape along the front right
side of the Frame Tube up the outer Light Bracket,
and plug the 2 prong cord into the Amber Lamp. Plug
the 3 prong cord into the Red Lamp.
10. Repeat for the Left Side (Yellow Tape).
11. Connect the 7 Pin Harness into the Light Module,
then route the Harness along the Drawbar with the
Hydraulic Hoses and secure with Tie Wraps.
12. Bundle and secure excess cord to the Module
Bracket with Tie Wraps. Secure cords along Frame
and Drawbar using Adhesive Mounts and Tie Wraps.
NOTE
If equipped with optional Electrical Clutch, install, route
and secure Electric Clutch Harness with the Warning
Lamp Harness.
IMPORTANT
All Harnesses must be firmly attached to Machine
Frame members or Hydraulic Hoses so they do not
sag or become torn loose by field debris.
13. Attach the SMV sign to the SMV Mount located on
Center Bracket with 5/16-18 x 1 Bolts, Flat Washers,
and Locknuts.
14. Attach the Connector Holder to the Drawbar Hose
Holder or 3Pt Hitch with 1/4-20 x 1 Bolts, Flat
Washers, and Locknuts.
NOTE
The 7-Pin Plug on the other end of the 7 Pin Harness
connects to the Tractor Socket when in use. When not in
use, it can be stored in the Connector Holder on the
Drawbar Hose Holder or 3Pt Hitch. Allow enough
Harness length to reach Tractor Socket and roll or fold up
excess and secure to Drawbar Hydraulic Hoses or 3Pt
Hitch.
Figure 2-14: Light Module and Bracket
0RGXOH
%UDFNHW
/LJKW0RGXOH
/RFNQXW
%ROW
[
Summary of Contents for Brillion SSB
Page 2: ......
Page 6: ......
Page 22: ...1 16 1P480rev0718 INTRODUCTION AND SAFETY INFORMATION Table provided for general use NOTES...
Page 31: ...ASSEMBLY 1P480rev0718 2 9 Table provided for general use NOTES...
Page 37: ...ASSEMBLY 1P480rev0718 2 15 Table provided for general use NOTES...
Page 45: ...ASSEMBLY 1P480rev0718 2 23 Table provided for general use NOTES...
Page 62: ...2 40 1P480rev0718 ASSEMBLY Table provided for general use NOTES...
Page 79: ...OPERATION 1P480rev0718 3 17 Figure 3 15 Rear Agitator Seed Chart...
Page 86: ...3 24 1P480rev0718 OPERATION Table provided for general use NOTES...
Page 100: ...5 4 1P480rev0718 REFERENCE TABLES AND SPECIFICATIONS Table provided for general use NOTES...