3-12 FINAL ASSEMBLY
3-12.1
Attach a tractor to the implement and
charge the lift system hydraulics as de-
scribed is
Section 4-4
.
3-12.2
Install the 1-1/2 x 16 lockouts on both
3-1/2 x 16 cylinders on the frame.
3-12.3
Connect lights to the tractor and verify
operation.
3-12.4
Check tires for proper inflation
3-12.5
Level the Coulter Chisel from front to
rear as described in
Section 4-8
.
3-12.6
Inspect the final implement assembly,
and verify that all bolts have been tightened,
cotter pins spread, and that there are no
leaking hydraulic connections.
CAUTION
TIGHTEN ALL 1-3/4" NUTS TO 1,200
FOOT-POUNDS OF TORQUE (SEE FIG-
URE 3-12).
3-12.7
Rotate each disc gang to verify that
each gang rotates freely. Adjust any scrap-
ers that may have shifted during shipment or
assembly.
3-12.8
Lubricate the Coulter Chisel at all loca-
tions
(See Section 4-15)
.
3-12.9
Touch up with paint any areas that may
have been scratched during moving, han-
dling, or assembly.
3-12.10
Thoroughly read and understand the
operating section before using the Coulter
Chisel.
3-13 OFFSET SHANK MOUNT INSTALLATION (OPTION)
If back row of shanks continually plug with resi-
due, offset shank mounts are available for the back
row of shanks. Contact the Landoll Corporation
Service department for more information.
3-13.1
If offset shank mounts are used, bolt to
the rear frame using u-bolts, and 3/4-10 hex
lock nuts
(See Figure 3-13)
.
3-22
Figure 3-12 1,200 Foot-Pounds of Torque
3/4-10 HEX LOCK NUT
12” OFFSET MOUNT
REAR FRAME
WELDMENT TUBE
U-BOLT
offset mount op
Figure 3-13 Offset Shank Mount Installation
Summary of Contents for 2110
Page 3: ...MODEL 2110 COULTER CHISEL OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO i...
Page 4: ...NOTES ii...
Page 8: ...NOTES 1 2...
Page 22: ......
Page 53: ...NOTES 3 31...
Page 54: ......
Page 67: ...NOTES 4 13...
Page 68: ......
Page 71: ...NOTES 5 3...