![Landis+Gyr 3 SMETS2 User Manual Download Page 53](http://html1.mh-extra.com/html/landis-gyr/3-smets2/3-smets2_user-manual_673710053.webp)
Installation and Commissioning
Issue 1.2
53/143
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
© Gyr
5
Navigate to
Rejoin HAN
item
Scroll through the Customer Menu
items with short presses of button
A until the Rejoin HAN option is
shown.
R e j o i n H A N
6
Select Rejoin
HAN menu
item
Press button B to select the Rejoin
HAN option
R e j o i n H A N ? A = n o
B = y e s
7
Confirm
selection to
Rejoin HAN
Press button B to confirm that
rejoining of the HAN.
H A N J o i n i n g . .
( c )
5
Check
Commissioned
Status
The installation agent can
determine if the meter has been
properly commissioned by check
for the pr
esence of a lower case ‘c’
in brackets in the bottom right
hand corner of the display.
NB:
This symbol is displayed on the
meter when it has successfully
synchronised clocks with the
comms hub
H A N J o i n O K
( c )
6
Meter returns
to top of
Customer
Menu
After 3 seconds the meter will
return to the top of the Customer
Menu to show the first item which
is “Manage PIN”.
M a n a g e P I N ? A = N o
B = Y e s
7
Exit Customer
Menu
Scroll through the customer menu
using button A until the Exit Menu
option is reached and press button
B to leave the customer menu.
E x i t M e n u
6.5.4.2 Commissioned Check via Service Menu
Step
number
Step entry
action
Step Description
Display
1
Access
Service Menu
Remove the terminal cover screw
until the Service Menu is activated.
The first item in the Service Menu
(In Service Test or IST mode
option) will be shown when the
terminal cover tamper switch is
activated
– if this has not
happened when the screw is fully
loosened sliding the terminal cover
out by a small amount may be
needed to activate the tamper
switch. Note, the terminal cover
should not be fully removed at this
point.
I S T ? A = N o
B = Y e s