Installation and Commissioning
Issue 1.2
45/143
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
© Gyr
2.
Align the edges of the communication hub with the top of the main
meter body.
3.
Slide the communication hub along the guides positioned on top of the
meter to ensure that the two connection points are met.
4.
Continue to move the communications module towards the back of the
meter until no further movement is possible.
5.
Securely tighten, but do not overtighten, the communication hub fixing
screw following any guidance or instructions provided by the supplier
of the communications hub.